Rigging the fixture
Caution!
1. The installations must be carried out by an authorized dealer or trained professional.
2. Unit may cause severe injures if you have doubts concerning the safety do not install.
3. Use high quality installation equipment to hang unit.
When rigging a unit it is very important that you follow common safety procedures. Rigging requires extensive experience includ-
ing but not limited to calculating working loads, material being used and periodic safety inspections. If you lack these qualifica-
tions, do not attempt the installation yourself, instead use a professional structural rigger.
When rigging the unit always be secured with a secondary safety attachment. The installation location of the projector has got to
be built in the way that it can hold 10 times the weight for 1 hour with out any harming. Installation should be checked at least
one time a year by a skilled person.
Cleaning and maintenance
Installation Maintenance:
The operator has to make sure that the unit is operating safely and has the installations and electron-
ics checked by an expert every 2 years.
The following points have to be considered during the inspection:
1) All screws used for installing the device or part of the device have to be tightly connected and must not be corroded.
2) There must not be any deformations on the housing, fixation and installation spots (ceiling, suspension, trussing).
3) The electronic power supply cables must not show any damages, material fatigue (e.g. porous cables) or sediments. Further
instructions depending on the installation spot and usage have to be adhered by a skilled installer and any safety problems
have to be removed.
4) Any Spilled fog fluid showed be cleaned immediately while Fogger is disconnected.
Note:
There is no serviceable parts inside the device. Maintenance and service operations are to be carried out by authorized
dealers.
Replacing the fuse:
Only replace the fuse with the same type and rating.
Replacing the power cable:
If the power cable of this device becomes damaged, it has to be replaced by authorized dealers only
In order to avoid hazards.
Should you have further questions , please contact your dealer.
Parts List
9201
Mega-Fog 55 Gal Drum
9215h
Heater
9215p
Pump
9215pcb
Main PCB card
9200
Mega-Fog 1 Gal
7
Caution!
To maintain optimum performance fixture should be cleaned frequently. It is recom-
mended to run a cleaning solution composed of 80% distilled water and 20% white vine-
gar through the system to prevent accumulation of particles in the heating element.