22
Maintenance and Field Adjustment
Tank Maintenance continued,
STEP 5: Decontaminate the machine by wiping
all SolarBee surfaces using a bleach/water
solution and a towel or cloth. Remove all excess
dust, sand, etc.
Do not use a pressure washer
to clean the Solar-Bee.
This may damage
the on-board electronics which may result in
improper operation of the Solar-Bee.
STEP 6: The SolarBee intake needs to be placed
in its original position and the entire hose layed
out across the floor.
The hose should not be
coiled or draped over the SolarBee!
Reposition
the electrical cord and injection hose so they do
not get tangled on any objects.
STEP 7: The SolarBee is now ready for the tank
to be filled with water and be turned “On”.
Most customers feel that removing the SolarBee
circulation equipment is the best option for
the safety of the equipment. Removing the
equipment also allows for the contractors
to perform their work freely and not have to
maneuver around the SolarBee.
Please contact SolarBee Customer Service,
1-866-437-8076 (customerservice@solarbee.
com), for a quote for temporary removal of
your SolarBee.
Hose properly layed out on tank floor.
SolarBee resting in drained tank.