Medite TFB 55 Instruction Manual Download Page 6

 

Rev. 00 (04/2010) - HE 

– TFB55e_Druck_00.DOC 

 
 
 
 

2.3 Transport/Storage 
 

The  TFB  55  is  delivered  in  a  protecting  box.  Please  move it only upright  and avoid 
shock. 
 
 

2.4 Unpacking 
 

Put the instrument on an even, solid surface and remove the protecting box and 
plastic wrap. If possible, keep the packing material to avoid damages in case of a 
later transport of the unit. Check whether the equipment is complete.  
 
The TFB 55 is supplied with one power cord and one instruction manual. 
 
 

2.5 Installation and Connection 
 

Before  starting  the  instrument,  please  make  sure  that  your  mains  voltage 
corresponds  to  the  value  indicated  on  the  instrument  (example:  for  an  instrument 
requiring 240 Volts, 200 - 240 Volts should be available; for a 115 Volts-instrument, 
there  should  be  100  -  125  Volts.)  The  instrument  is  supplied  ready  to  use.  For 
connection to mains the included power cord must be used. It must be connected to 
a socket with intact ground wire. 

Summary of Contents for TFB 55

Page 1: ...Read this manual before starting the instrument Rev 00 04 2010 Copyright Duplication of this manual by any means for any purpose without written consent of Medite GmbH is prohibited MEDITE GmbH Wollen...

Page 2: ...E Guidelines indicated below including all changes and addendums to date thereto The above mentioned product has been controlled and meets the following standards and guidelines EU Directive 2004 108...

Page 3: ...e 1 1 3 Authorized Operator 1 1 4 Safety measures on site 1 2 Transport Installation 2 2 1 Technical data 2 2 2 Operation conditions 2 2 3 Transport Storage 3 2 4 Unpacking 3 2 5 Set up and connection...

Page 4: ...reasons For the exchange of defective parts only original medite spare parts have to be used The conditions for operation maintenance and service mentioned in this instruction manual have to be strict...

Page 5: ...system avoids overheating and damage even in case of empty bath Equipment mains switch temperature control with scale in C 2 2 Operating conditions The operation is only allowed in closed rooms labor...

Page 6: ...whether the equipment is complete The TFB 55 is supplied with one power cord and one instruction manual 2 5 Installation and Connection Before starting the instrument please make sure that your mains...

Page 7: ...ne by the enclosed rubber ring being rolled over the thermometer from above 2 Fill with distilled or fully desalinated water up to 1 2 cm below the rim of the bath If tap water is used the black inter...

Page 8: ...y turning the temperature regulator knob Always turn clockwise Pilot lamp lights up and extinguishes when the temperature is achieved Before the required temperature is achieved heating will be switch...

Page 9: ...damage the black epoxy coating In case of a non functioning of the instrument e g caused by voltage oscillations please check whether the fuses in the back of the instrument are defect Should the def...

Page 10: ...riod of use please deliver the equipment to an authorized disposal facility The company Medite as manufacturer is also prepared to take back the equipment for disposal against payment for the disposal...

Page 11: ...Rev 00 04 2010 HE TFB55e_Druck_00 DOC 8 7 Wiring diagram...

Page 12: ...ES 99 430 Width 360 mm Depth 570 mm Height 300 mm Cooling plate 210 x 260 mm Temperature adjustable from 15 C to 10 C Weight 20 kg Voltage 230V 50Hz 150VA Dispenser Unit TES 99 200 Width 360 mm Depth...