Hardware Installation Guide - Mediatrix Sentinel
12
Getting Started
Installation Check List
Task
Verified by
Date
Network information available &
recorded in site log
Location requirements verified
Site power Voltage
Installation site pre-power check
completed
Mounting tools and equipment
available
Additional equipment available
Mediatrix unit received
Quick start guide received
Regulatory compliance and safety
information received
Warranty card received
Software version verified
Rack, desktop mounting of chassis
completed
Initial electrical connections
established
ASCII terminal attached to console
port
Cable length limits verified
Initial configuration performed
Initial operation verified
Package Check List
Item
Condition
1 Mediatrix unit
1 Power cord with the proper model for the country