14 

00238 

It is essential that the installation is carried out in the order given  

below to ensure the correct operation of the system. 

 

First read the system description sheet before following the  

instructions below 

 

1. 

Connect the gas valve to the marked terminals “gas valve”

2. 

Connect current monitors where required (

7 & 8 on diagram

)

 

3. 

Connect the pressure sender unit to the marked terminals (

10

)

 

4. 

Connect any additional EM stop buttons or thermal links in series to the terminals marked “EM stop” (

6

)  

 

5. 

Each detector/device has a rotary address switch, each switch should be set to a different number or letter starting with “0”. 
Then connect the gas detectors to terminals marked “detectors” on the panel. Detectors are wired in parallel. “Daisy 
chain” (

11 & 12 

6. 

Connect fire alarm, ensure potential free n/c (

13

7. 

Connect 0-10 volt to speed controllers 0-10 volt inputs where required (

14

)   

8. 

Ensure any BMS connections are made to the relays (

15

9. 

Connect the 3 amp fused spur 240 volt supply to marked terminals. 

10. 

At this point check that the sender unit has been fitted to the control valve and that gas is available  

11. 

Once power is connected to the panel the detectors will flash the green LEDs for 90 seconds after which the LEDs will be on 
continuously. 

12. 

Press the “learn field button” (

23

) this is on the main circuit board on the right hand side, just over half way up the board 

pressing this once allows the panel to learn how many and which type of detectors are fitted. 

13.

 

Press and keep pressed the “display detectors” button whilst checking on the LCD display that all the detectors have been 
recognised by the panel. A recognised detector will appear as “

CO

” Carbon Monoxide, “

CM

” combustible, “

CH

” Carbon 

Dioxide, “

OX

” Oxygen depletion and “

TP

” Temperature. Count the number of “seen” detectors on screen and ensure total is 

the same as the number of detectors installed. “

NM”

 in the third column means that number is not monitored. If more than 8 

detectors are fitted then press both the “display detectors” and the “pressure” buttons together to view the next 8 detectors. 

Note

 that a detector set at 0 appears as 1 on the LCD and a detector set as 1 appears as 2 on the LCD etc.

 

14. 

At this point turn the on/off switch to the on position press the “gas” button, the panel will test to ensure gas tightness and 
provided there are no leaks the panel will allow gas through and the gas on LED will light. Should the gas test fail then press 
the pressure button to see the pressure in mbars on both sides of the valve. Thus you can see the pressure drop 
downstream provided the valve is closed 

15. 

Check that the panel can see the smallest allowable pressure drop if it does not then increase the proving time by adjusting 
the blue rotary dials (prove time) on the circuit board and or by switching on SW=X2 

(16)

 

 

16.

 

Check the operation of the electric contactor by pressing the ’Electric’ button on the panel lid to switch on and off. 

 

Checklist 

 

Please do not hesitate to call for advice on the  

following numbers: 

0161 233 0600 office hours 

Or out of hours call: 

Notes. 

It is recommended that all systems are commissioned a er installa on by Medem UK. This will extend the warranty period from 5 

years to 10 years and ensure the system is working as designed.  

Please see warranty condi ons that came with the main panel 

SEC-L 

v4

 

Summary of Contents for SEC-L v4

Page 1: ...s installed and commissioned to the satisfaction of the manufacturer A commissioning certificate must be issued to the end user along with instructions for the operation of the equipment As the Manufa...

Page 2: ...e Blind buttons A and B for engineer functions LED indications Power On green A blind button for displaying gas pressures on the LCD screen Gas Electric Water red when active to warn of live service F...

Page 3: ...for full details 16 OPTA Over pressure check will isolate gas supply if pressure exceeds 70 mbar 17 Fill prove time for gas pressure proving see page 5 18 Timer adjustment for fan commissioning allow...

Page 4: ...ip switches One condition selectable from each relay Max switching 48 volts 1 amp 15 BMS Relay PCB Press button A To display the gas pressures and view the set pressure proving set times Press button...

Page 5: ...comm To enable the commissioning of the gas portion of the system before the ventilation interlock is completed you may temporarily disable the interlocking by pressing button 22 This will bypass the...

Page 6: ...hat is being monitored for See the gas detectors own instructions for more guidance The maximum cable length between a detector and the control panel should not exceed 100 metres whilst we would alway...

Page 7: ...ween 1m and 3m from the potential source Care should be taken so they are not located close to the edge of a canopy or in direct flow of the supply or extract ventilation For additional information or...

Page 8: ...ed through the Medem CM2M K2 channel current Monitor fans Fan speed controls Fan live Supply Fire Alarm Requires a volt free NC contact Where using 3 phase fans interlock on a single phase See page ni...

Page 9: ...hin the panel IMPORTANT If wired this way a warning notice must be attached to the panel to indicate that there are two separate mains feeds Contactor coil Live feed through switched relay To bench so...

Page 10: ...the correct way round Note there is no flow through the pressure sender unit it is purely reading the pressures either side of the valve Correct Pressur e Solenoid Never mount the valve such that the...

Page 11: ...d coil of the valve should never be mounted below the horizontal Pressure sender unit should never be mounted upside down to protect from water ingress Approx 400mm length INLET PORT OUTLET PORT Note...

Page 12: ...red in series with the EM stop buttons To EM Stop connections in the panel Indicator bar shows when pressed Normal EM Stop Activated Multiple Stop Buttons Single Stop Buttons Resetting indicator bar T...

Page 13: ...UK will exchange faulty valves for return to the manufacturer 5 Where a Medem UK engineer or another company appointed by Medem UK commission and installed system then that system will carry a ten ye...

Page 14: ...D display that all the detectors have been recognised by the panel A recognised detector will appear as CO Carbon Monoxide CM combustible CH Carbon Dioxide OX Oxygen depletion and TP Temperature Count...

Page 15: ...st If at any point the fans stop running opening the S1 or E1 contact the system will isolate the gas and report fans not running Check that the fans are not only switched on but actually running and...

Reviews: