Medem UK Warranty 

Terms & Conditions 

 

1. 

The warranty is a parts warranty and Medem UK Ltd will not cover or accept any labour or 
other expenses that may be incurred in the process of changing faulty product. 

 
2. 

All panels and sender units are covered by a five year warranty. 

 
3. 

Gas detector units and other remote detectors carry a two year warranty. Installation of the 
detectors should not be undertaken until all building and construction work is completed. 

 
4. 

Gas solenoid valves carry the original manufacturers warranty, though as the supplier 
Medem UK will exchange faulty valves for return to the manufacturer. 

 
5. 

Where a Medem UK engineer (or another company appointed by Medem UK) commission 
and installed system then that system will carry a ten year warranty. This applies to the 
main panel and the sender unit. At the time of commissioning a security label with a serial 
number will be attached to the main panel box. photographs and a comprehensive record 
of the installation will be held by Medem UK. 

 
6. 

Where a warranty claim is made then, where appropriate, a written order to attend site 
must be provided to Medem UK A cost for labour and travel to site will be prepared as a 
quote. The cost must be included in the order. 

 

7. 

Where it is found that the installation and/or the quality of workmanship has contributed to 
or wholly caused the failure of the product then we reserve the right to charge the whole or 
a proportion of the cost of the faulty item.

 

SEC-L 

v4

 

Summary of Contents for SEC-L v4

Page 1: ...s installed and commissioned to the satisfaction of the manufacturer A commissioning certificate must be issued to the end user along with instructions for the operation of the equipment As the Manufa...

Page 2: ...e Blind buttons A and B for engineer functions LED indications Power On green A blind button for displaying gas pressures on the LCD screen Gas Electric Water red when active to warn of live service F...

Page 3: ...for full details 16 OPTA Over pressure check will isolate gas supply if pressure exceeds 70 mbar 17 Fill prove time for gas pressure proving see page 5 18 Timer adjustment for fan commissioning allow...

Page 4: ...ip switches One condition selectable from each relay Max switching 48 volts 1 amp 15 BMS Relay PCB Press button A To display the gas pressures and view the set pressure proving set times Press button...

Page 5: ...comm To enable the commissioning of the gas portion of the system before the ventilation interlock is completed you may temporarily disable the interlocking by pressing button 22 This will bypass the...

Page 6: ...hat is being monitored for See the gas detectors own instructions for more guidance The maximum cable length between a detector and the control panel should not exceed 100 metres whilst we would alway...

Page 7: ...ween 1m and 3m from the potential source Care should be taken so they are not located close to the edge of a canopy or in direct flow of the supply or extract ventilation For additional information or...

Page 8: ...ed through the Medem CM2M K2 channel current Monitor fans Fan speed controls Fan live Supply Fire Alarm Requires a volt free NC contact Where using 3 phase fans interlock on a single phase See page ni...

Page 9: ...hin the panel IMPORTANT If wired this way a warning notice must be attached to the panel to indicate that there are two separate mains feeds Contactor coil Live feed through switched relay To bench so...

Page 10: ...the correct way round Note there is no flow through the pressure sender unit it is purely reading the pressures either side of the valve Correct Pressur e Solenoid Never mount the valve such that the...

Page 11: ...d coil of the valve should never be mounted below the horizontal Pressure sender unit should never be mounted upside down to protect from water ingress Approx 400mm length INLET PORT OUTLET PORT Note...

Page 12: ...red in series with the EM stop buttons To EM Stop connections in the panel Indicator bar shows when pressed Normal EM Stop Activated Multiple Stop Buttons Single Stop Buttons Resetting indicator bar T...

Page 13: ...UK will exchange faulty valves for return to the manufacturer 5 Where a Medem UK engineer or another company appointed by Medem UK commission and installed system then that system will carry a ten ye...

Page 14: ...D display that all the detectors have been recognised by the panel A recognised detector will appear as CO Carbon Monoxide CM combustible CH Carbon Dioxide OX Oxygen depletion and TP Temperature Count...

Page 15: ...st If at any point the fans stop running opening the S1 or E1 contact the system will isolate the gas and report fans not running Check that the fans are not only switched on but actually running and...

Reviews: