Hoses and Cables
Note:
Refer to
Parts Section 5 for detailed hydraulic hose diagrams.
Inspect all hoses and electrical cables for security and damage. Hoses and cables should be
examined for rubbing and chafing.
Check for leaks at fittings. Replace any damaged hose or cable.
1. Tag hoses for proper reassembly.
2. Disconnect hoses and IMMEDIATELY cap the openings to prevent contamination.
3. Torque hose fittings according to the Hydraulic Torque Specification Table.
Platform Removal
1. Raise platform about three (3) feet (1.0 m) and block the arms in the raised position. Also,
connect overhead crane by appropriate lifting device to platform.
2. Disconnect all platform wires.
3. Remove the bolts from both platform brackets at the rear of the machine.
4. Slide platform and roll out deck off the machine.
Summary of Contents for 3072RT
Page 40: ...March 2008 3072RT 3772RT 3772RT HD Service Parts Manual ANSI Specifications Page 1 26...
Page 52: ...March 2008 3072RT 3772RT 3772RT HD Service Parts Manual ANSI Specifications Page 2 12...
Page 93: ...3072RT 3772RT 3772RT HD Service Parts Manual ANSI Specifications March 2008 Page 5 9...
Page 96: ...March 2008 3072RT 3772RT 3772RT HD Service Parts Manual ANSI Specifications Page 5 12...