Page 48
84RT Seres Speed Level™ - Operator’s Manual
July 2021
Secton 15 - Transport and Lftng Instructons
Lifting and Tie Down Instructions
Only qualified riggers should rig and lift the machine�����
Ensure that the crane capacity, loading surfaces and straps are sufficient
to withstand the machine weight����� See the serial plate for the machine
weight�����
Fully lower the platform. Be sure the extension deck is retracted and the module doors are
closed and secure. Remove all loose items from the machine.
Determine the center of gravity of the machine.
Attach rigging to the designated lift points only.
Adjust the rigging to prevent damage to the machine and to keep the machine level.
Securing to Truck or Trailer for Transport
Lock the extension deck in the retracted position.
Turn the key switch to OFF and remove the key before transport.
Turn the battery disconnect switch to OFF before transport.
Inspect the entire machine for loose or unsecured items.
Use chains or straps of ample load capacity.
Use a minimum of two (2) chains or straps.
Adjust the rigging to prevent damage to the chains and the machine.
Center of Gravity and Lifting Points
ART_3104
X Axis
Y Axis
Center of Gravity
3084
X Axis
45.89 in. / 116.57cm
Y Axis
10.89 in. / 27.65 cm
•
•
•
•
•
•
•
•
•
•
•