![MDV MFS2i-24ARN1 Service Manual Download Page 16](http://html1.mh-extra.com/html/mdv/mfs2i-24arn1/mfs2i-24arn1_service-manual_1757516016.webp)
13
a) Only the correctly installing of indoor and outdoor unit done, can the refrigerant
pipe be connected.
b) The cut-off valves are completely close before ex-work. Before connecting the
refrigerant pipe, be careful to check whether the valves are completely close.
c) The connecting procedure of refrigerant pipe: first, unscrew the two valves on
the outdoor unit and the pipe-jointing nut on the indoor unit(please keep them
care fully). Please connect the refrigerant pipe according to the manual, the
pipe-jointing nut should be screw tightly and no leakage. Note: you need two
wrenches to make balance.
d) When the connecting of refrigerant pipe is finished, before power on the system,
you should vacuum the indoor unit through the maintenance port on the cut-off
valves, or open the high-pressure valve, and exhaust the air through the
maintenance port on the low-pressure valve(closed). It will take about ten
seconds. Then screw tightly the maintenance port. (When supplement the
refrigerant, fill through the maintenance port of the low-pressure valves on the
outdoor unit ).
e) Open all the valves completely before power on the system, or it will be sick for
low efficiency.
f)
Gas leak check. Make sure no gas from connections with leak detector or soap
water.
Caution:
A: Lo packed valve B: Hi packed valve
C and D are ends of indoor unit connection.
Caution in Handling the Packed Valve
a.Open the valve stem until it hits against the stopper. Do not try to open it further.
b.
Securely tighten the valve stem cap with a spanner or the link.