
A
E
E
F
F
F
D
F
B
B
C
M
L
G
I
H
N
O
O
O
O
41
8-MAINTENANCE AND CLEANING
CLEANING THE UPPER EXCHANGER
CLEANING THE UPPER EXCHANGER
Perform the following operations with the stove switched off and cold to clean the upper exchanger.
1. Remove top
A
2. Remove the lateral sides
B
3. Remove the front panel
C
4. Remove the upper cap
D
, which is beneath top
A
, by removing the two screws on the right side and the 2 on the left side
E
. Then
remove the six upper screws
F
.
5. Then open door
G
and remove the upper screw
H
on bracket
I
.
6. Remove the fan unit
N
by loosening the four screws
O
that block it to the structure.
7. Remove the exchanger
L
by loosening the four screws
M
that fasten it.
Scrape the walls of the firebox with a rigid rod or a bottle brush inside the exchanger, for the ash to fall into the lower ash collection
compartment.
Clean all the parts and set them back into place using a new head gasket under the upper exchanger.
Technical Dept. - All rights reserved - Reproduction is prohibited