Installation Guidelines

1

Place the vertical coil section in position. If an access 
section is positioned downstream from the coil section and 
not already assembled to the coil section, secure the two 
sections together.

2

Lift the fan section on top of the vertical coil section, taking 
care to line up the joining collar in the bottom of the fan 
section.

3

For sizes 003 to 035, the bypass duct is integral to the unit 
construction and does not require attachment to the bypass 
section. For sizes 040 to 090, position and assemble the 
bypass duct to the bypass section before joining to the fan. 

4

Once the fan is positioned on top of the vertical coil section 
and the bypass duct and bypass section are assembled, 
position the two assemblies and line up the joining collars 
with the openings in the fan and vertical coil section.

5

Once the sections are lined up and in position, secure the 
unit together by fastening joining plates to the unit.

Figure 17: Assembly of fan coil sections

Unit Sizes 040 to 090 External Face and Bypass Duct 

Assembly

When unit sizes 040 to 090 are ordered with external face and 
bypass, the bypass duct ships separately and must be attached 
to the unit in the field. The joining of the bypass duct to the unit 
must be done after the unit is assembled. Also, if the bypass 
duct is over 90" long, the duct does not ship in one piece and 
must be field assembled. The field assembly of the bypass duct 
to the unit requires the following steps. See Figure 18. 

1

Position the unit shipping sections together and assemble in 
the equipment room.

2

After the unit is assembled, lift the duct into position over 
the unit. Joining collars are shipped factory assembled to 
the unit and duct. There is a joining collar located in the top 
of the bypass opening and in the leaving air side of the 
bypass duct. These joining collars are used to provide air 
seals. Line up the duct with the top openings in the unit.

3

If the bypass duct is longer than 90", the duct ships in more 
than one piece and must be field assembled. Place the piece 
of duct that has the joining collar on the bottom on top of 
the unit first. Once it is in place, position the other piece of 
duct. Take care to fit the splice collar into the first piece of 
duct and then lower the other end into the bypass opening.

4

Once the duct is positioned correctly, fasten the duct pieces 
together with the joining plate provided. To do this, remove 
the fasteners in the corners of the duct assemblies, place the 
plate over the holes in the corners, and then replace the 
fasteners. See Figure 7 on page 4

.

Figure 18: Assembly of bypass duct to unit

Joining 
collar

J o i n i n g   C o l l a r

J o i n i n g   C o l l a r

J o i n i n g   C o l l a r

Summary of Contents for Vision CA Series

Page 1: ...McQuay IM 782 1 1 Installation and Maintenance Manual IM 672 3 Group Applied Air Part Number IM 672 Date June 2005 2005 McQuay International Vision Air Handler Sizes 003 090...

Page 2: ...ctions 10 Multizone Damper Adjustment 10 Multizone Mixing Box and Economizer Damper Torque Requirements 11 Mounting Actuators 11 Face Bypass Damper Torque Requirements 11 Piping and Coils 11 Water Coo...

Page 3: ...of the multi zone units with special care Zone dampers are set and inspected before leaving the factory but should be checked on arrival to the job to verify the bell arm and connecting rod set screws...

Page 4: ...can be removed If necessary the unit can be disassembled Maintain at least 54 of clearance in front of electrical power devices starters VFDs disconnect switches and combination devices Electrical po...

Page 5: ...mbled or as separate shipping sections Rig units that require field assembly of shipping sections into position first Shipping sections are provided with a connection splice joint attached on the leav...

Page 6: ...6 18 1 bolt Once the bolt is in place secure the bracket to the adjoining section with a 1 4 1 drill screw Repeat the same procedure on both corners of the unit See Figure 8 Figure 8 Vertical inverted...

Page 7: ...The optional base rail provided by the factory has 5 8 diameter holes in each corner to run hanger rods through To properly support the unit and maintain unit integrity support each shipping section...

Page 8: ...moving parts or electrical wiring See Figure 15 1 Remove padlock if one is present 2 Insert 1 2 socket into cup and rotate 1 4 turn clockwise as shown in Figure 15 If the cup and handle are on the le...

Page 9: ...ation for securing heavier components self tapping screws are not acceptable Ensure that the location permits the full operation of all access doors and panels and does not interfere with other vital...

Page 10: ...t be done after the unit is assembled Also if the bypass duct is over 90 long the duct does not ship in one piece and must be field assembled The field assembly of the bypass duct to the unit requires...

Page 11: ...of the vertical bypass section 3 After the components in the multizone are fitted together fasten the joining plates to the corners in the unit exterior 4 If a damper was ordered assemble it to the se...

Page 12: ...ld deck closes when the bell arms are 45 from the vertical center The hot deck closes when the bell arms are 45 clockwise from the vertical center b Three deck zone dampers The cold deck closes when t...

Page 13: ...e Face and bypass dampers have a torque requirement of 10 in lbs per square foot of damper face area Piping and Coils When designing and installing piping Follow applicable piping design sizing and in...

Page 14: ...h the coil Do not attempt to lift condensate when using modulating or on off control Traps Size traps in accordance with the manufacturers recommendations Make sure that the required pressure differen...

Page 15: ...ker 1 2 check valve Steam main Return main 12 min Vacuum breaker 1 2 check valve Steam main Return main 12 min Full size of return conn Check Valve Strainer Gate Valve Control valve modulating two pos...

Page 16: ...the opposite drive side of the unit are difficult to access from the drive side of the unit Either remove them before the unit is assembled or remove the panel on the opposite drive side to gain acces...

Page 17: ...s are provided by others When the unit is factory provided with a disconnect switch starter or a variable frequency drive VFD the components are mounted on the outside of the unit cabinet Factory wiri...

Page 18: ...cendie et d lectrocution pouvant causer des dommages mat riels des blessures et m me la mort L alimentation lectrique du moteur du ventilateur de m me que la mise la terre du ch ssis du moteur doivent...

Page 19: ...lationship forward curved type fan wheels Notes 1 To obtain rated air performance dimensional relationship must be held 2 Adjust dimension C by loosening wheel hub setscrews shifting wheel s axially a...

Page 20: ...r in ft lbs kg m 1 4 5 5 76 1 16 10 5 1 45 3 8 19 0 2 63 7 16 29 0 4 01 1 2 42 0 5 81 5 8 92 0 12 72 Overlap Table 7 Unit sizes 003 to 035 Fan operating limits Forward curved housed Dia 9 4 9 7 9 9 10...

Page 21: ...00 AF40 25 AF27 00 AF24 50 AF22 25 AF20 00 AF38 50 AF33 00 AF30 00 500 600 700 800 2000 1000 1500 1500 2000 3000 2500 Torque in lb Table 9 Operating limits plenum fans Fan operating limits Plenum fans...

Page 22: ...t or debris on wheel blades b Loose set screws in wheel hub or bearing to shaft c Wheel distorted from overspeed 2 Bent shaft 3 Drive faulty a Variable pitch sheaves Axial and radial runout of flanges...

Page 23: ...y sized fixed sheave A matching fixed sheave provides longer belt and bearing life and minimizes vibration Initially it is best to have a variable pitched motor sheave for the purpose of air balancing...

Page 24: ...xternal key E and securely tighten setscrews B over key and setscrews C into keyway in fixed half of the sheave 4 Put on belts and adjust belt tension Do not force belts over grooves See Fan Drive Bel...

Page 25: ...e Belt Adjustment on page 25 10 Before starting the drive ensure that all keys are in place and all setscrews and all capscrews are tight Check and retighten all screws and retension belts after appro...

Page 26: ...not open C sheaves more than 9 1 2 turns Do not open 5V sheaves more than 6 turns Do not open 8V sheaves more than 8 turns 6 Tighten BOTH locking screws A in the outer locking ring before operating th...

Page 27: ...o N o t R e m o v e I n n e r L o c k i n g R i n g O u t e r L o c k i n g R i n g S p l i t T a p e r B u s h i n g 3 H o l e s f o r S p a n n e r W r e n c h o r D r i f t Belt span Deflection Bel...

Page 28: ...Filter gauge Table 15 Belt deflection force per Browning specifications Cross section Sheave diameter in Deflection force lbs Smallest sheave diameter range rpm range Cross section A B 5V Cross secti...

Page 29: ...l To remove a side or top panel 1 Remove the flat head fasteners located along the sides of the panel 2 Once all fasteners are removed lift off the panel Removing a Frame Channel Frame channels that r...

Page 30: ...nd configuration of the coil affects how the coil can be removed Single banks of coil are fastened only on the connection side of the unit Stacked and staggered coils are fastened on both ends of the...

Page 31: ...e bolt the coil to the section 4 Caulk the mounting surface of the steel plate and install the plate on the coils 5 Caulk the mounting surface of the drain trough and install the drain trough on the c...

Page 32: ...ges must be prepaid The return of the part does not constitute an order for replacement Therefore a purchase order must be entered through the nearest McQuay representative The order should include pa...

Page 33: ...McQuay IM 672 3 31...

Page 34: ...32 McQuay IM 672 3...

Page 35: ......

Page 36: ...ment its care should be a high priority For training information on all McQuay HVAC products please visit us at www mcquay com and click on Training or call 540 248 0711 and ask for the Training Depar...

Reviews: