![McQuay RAH 047C Installation And Maintenance Manual Download Page 119](http://html1.mh-extra.com/html/mcquay/rah-047c/rah-047c_installation-and-maintenance-manual_1756077119.webp)
McQuay IM 987
119
Rooftop Equipment Warranty Regist. Form
Warranty Registration Form (continued)
E. Ambient temperature ______________________ °F
F. Oil safety control time delay (sizes 115 to 135C only):
Compressor #1 ________ sec.
Compressor #3 _______ sec.
Compressor #2sec.
Compressor #4 ________ sec.
G. Compressor lockout timers function? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
H. FanTrol functions:
TC13 _________
TC14 ________
I. Part winding start time functions (sizes 115 to 135C option only):
Compressor:
TD1 __________
TD2 __________
TD3__________
TD4 __________
Supply fan:
TD9 __________
Return fan:
TD19 _________
J. Does unit start up and perform per sequence of operation? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
IV. PERFORMANCE DATA
A. Compressor voltage across each phase:
1–2_________ V
2–3 _________ V
1–3 ________ V
B. Compressor amperage of fully loaded compressor:
Compressor #1
Phase 1 _______
Phase 2 ________ Phase 3 ________
Compressor #2
Phase 1 _______
Phase 2 ________ Phase 3 ________
Compressor #3
Phase 1 _______
Phase 2 ________ Phase 3 ________
Compressor #4
Phase 1 _______
Phase 2 ________ Phase 3 ________
Compressor #5
Phase 1 _______
Phase 2 ________ Phase 3 ________
Compressor #6
Phase 1 _______
Phase 2 ________ Phase 3 ________
C. Low pressure cut-out:
Circuit 1 __________ psig
Circuit 2 ___________ psig
Low pressure cut-in:
Circuit 1 __________ psig
Circuit 2 ___________ psig
D. High pressure cut-out:
Circuit 1 __________ psig
Circuit 2 ___________ psig
E. Discharge pressure, one compressor:
Circuit 1 ___________ psig
Circuit 2 __________ psig
Discharge pressure, fully loaded, 2–3 compressors:
Circuit 1 ___________ psig
Circuit 2 __________ psig
F. Suction pressure, one compressor:
Circuit 1 ___________ psig
Circuit 2 __________ psig
Suction pressure, fully loaded, 2–3 compressors:
Circuit 1 ___________ psig
Circuit 2 __________ psig
Liquid press, fully loaded, 2–3 compressors
(at liquid line shutoff valve):
Circuit 1 ___________ psig
Circuit 2 __________ psig
Liquid temperature, fully loaded, 2–3 compressors:
Circuit 1 ___________ psig
Circuit 2 __________ psig
G. System oil pressure (oil pressure-suction-net oil pressure):
(on four-compressor units, indicate for each compressor)
Circuit 1 ___________ psig
Circuit 2 __________ psig
H. Suction line temperature:
___________ °F
____________ °F
I. Superheat:
___________ °F
____________ °F
J. Subcooling:
___________ °F
____________ °F
K. Is the liquid in the line sightglass clear and dry? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
L. Does the hot gas bypass valve function properly?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
M. At what suction pressure does the hot gas bypass valve open?
__________ psig
__________ psig
N. Record discharge air temperature at discharge of unit:
____________°F
O. Are all control lines secure to prevent excessive vibration and wear? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
P. Are all gauges shut off and valve caps and packings tight after start-up? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
V. ELECTRIC HEAT CHECK, TEST & START
A. Electrical heat service corresponds to unit nameplate? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
Volts
Hertz
Phase
B. Are there any signs of physical damage to the electric heat coils? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
C. Have all electrical terminals been tightened?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
D. Does sequence controller stage contactors properly? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A
E. Electric heater voltage across each phase:
____________L1
____________L2
___________ L3
F. Amp draw across each phase at each heating stage:
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Phase L1:
___________
___________
____________
____________
___________
___________
Phase L2:
___________
___________
____________
____________
___________
___________
Phase L3
___________
___________
____________
____________
___________
___________
G. FLA:
L1 ___________
L2 ___________
L3____________
H. Operate electric heat with fans off. Electric heat must cycle on high limit control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
No
N/A