Orolia Ltd, Silver Point, Airport Service Rd, Portsmouth, Hants, PO3 5PB, United Kingdom
Tel: +44 (0) 23 9262 3900 Fax: +44 (0) 23 9262 3998 Email:
Page | 3
2. DISASSEMBLY
2.1:
Remove the activation cap. The beacon will activate. Switch off the beacon by
pushing and holding the ‘Off’ button – the beacon should switch off after
approximately 3 seconds.
NOTE: Do not allow beacon to operate for longer than 15 seconds.
2.2:
Remove LED cap by removing 2 off Screws.
2.3:
Remove the battery. The PCB & foil insert do not need to be removed.
Note:
The battery should be disposed of in a sensible and considerate manner, and
in accordance with local regulations. Also the LED cap and gasket are not reusable
and should be disposed of.