Commercial in Confidence
Smartfind EPIRB service manual
Page 19
3.5. Disassembly
EPIRB disassembly should be done under static safe work condition (section 1.3.).
a) Dome moulding removal
1.
Invert unit and using large posi-driv screwdriver remove 3 off screws and
washers.
2.
Carefully pull the dome moulding vertically clear of the bottom moulding
being careful not to damage the PCB. The PCB is located in guides in
bottom moulding.
3.
Disconnect the 3 OFF battery packs by unplugging on the PCB.
4.
Remove the sealing o-ring from the dome and discard.