Agile 4250 O & M Manual Iss-01
15.
30 Month - maintenance checks
Date:
36 Month - maintenance checks
Date:
Cleaning & maintenance undertaken:
Cleaning & maintenance undertaken:
Checked
by
(name/
business):
Checked
by
(name/
business):
Reported Issues Found:
1. Ensure the building is securely anchored and unlikely to move. Check all anchor and skid pin positions.
2. Visually inspect the roof sheet for punctures or any obvious signs of wear.
3. Check that the gable end tension is applied evenly throughout the gable end pocket and that the U&T
infill is securely seated in the aluminium channel, trapping the sheet.
4. Check the personnel doors are seated well and that the hinges are moving freely.
5. Check the personnel door latches are secure and latch properly.
6. Check the popholes are seated well and that the hinges are moving freely.
7. Check the pophole latches are secure and latch properly.
8. Visually inspect the framework alignment to ensure the building remains square. Check from inside and
outside the building.
9.
Check the slatted floor is well seated and the plastic edging strip around the floor perimeter is sitting in
its correct position.
10.
Visually inspect underneath the slatted floor for uncommon features/ debris.
11. Visually inspect the full length of both skids inside and outside the building. Ensure there is no build-up of
mud or bird waste on the skis. Ensure the skids have not sunk into the ground.
Reported Issues Found:
1. Ensure the building is securely anchored and unlikely to move. Check all anchor and skid pin positions.
2. Visually inspect the roof sheet for punctures or any obvious signs of wear.
3. Check that the gable end tension is applied evenly throughout the gable end pocket and that the U&T
infill is securely seated in the aluminium channel, trapping the sheet.
4. Check the personnel doors are seated well and that the hinges are moving freely.
5. Check the personnel door latches are secure and latch properly.
6. Check the popholes are seated well and that the hinges are moving freely.
7. Check the pophole latches are secure and latch properly.
8. Visually inspect the framework alignment to ensure the building remains square. Check from inside and
outside the building.
9.
Check the slatted floor is well seated and the plastic edging strip around the floor perimeter is sitting in
its correct position.
10.
Visually inspect underneath the slatted floor for uncommon features/ debris.
11. Visually inspect the full length of both skids inside and outside the building. Ensure there is no build-up of
mud or bird waste on the skis. Ensure the skids have not sunk into the ground.