4 - 1
Special Operations - In Ditch
Overview
The carriage may be removed and hoisted into a ditch. The 4
jaw carriage can be used with heater and facer attached to the
indexer or if needed, a more compact 3 jaw carriage. Using the
3 jaw carriage requires lifting equipment to hoist the heater and
facer from overhead and will require an optional 3 jaw in-ditch kit
containing heater and facer stands, stripper bars for heater, and
guide rod bracket for facer. An optional hose and cable extension
kit is required for both 3 jaw and 4 jaw in-ditch operation.
NOTICE:
Turn ignition key to off position before doing anything
else.
TX04487-10-24-12
PH
04
79
0-10
-2
4-12
Remove Hydraulic Hoses and Cables
Disconnect the hydraulic hoses, electrical cables, and heater
power cable from the carriage.
NOTICE:
All connections must be disconnected or damage will
result when removing the carriage.
TX04488-10-24-12
PH
04
76
6-10
-8-12
PH
04
810
-10
-8-12