Oper
ation
Fusion Outlet
4 - 1
Operation - Fusion Outlet
Hornet™ XL
OPERATION - FUSION OUTLET
Attach Hornet™ XL to Pipe
1)
Determine the size of the main pipe and the size of
outlet that will be fused. If the main pipe size is greater
than 315mm (12" OD), the extension chains need to
installed. Refer to
section of
this manual for installation procedure.
2)
Apply the carriage brake so the carriage will not move
while attaching the Hornet™ XL. The handwheel can
be removed and positioned on the other side of the
carriage if needed.
3)
Position the tailstock against the main pipe.
4)
Wrap the chains around the pipe and up to the clamp
knobs of the tailstock.
5)
Pull the chain tight and insert the closest link of the
chain into the slot of the clamp bracket.
6)
Tighten the clamp knob until the tailstock is firmly
secured to the main pipe. Repeat these steps for the
other chain.
The clamp knobs are equipped with a ball thrust bearing,
which permit the operator to develop high clamp forces with
minimal effort.
7)
Clean the main pipe in the area where the fitting will be
fused.
CD02445-02-25-19
CD02447-02-25-19
CD02448-03-15-19
CD02448-02-25-19
CD02446-02-25-19
Carriage Brake
Clamp Bracket
Summary of Contents for Hornet XL ASW31401
Page 33: ...Notes 9 1 Notes Hornet XL NOTES Notes ...