![MBA Instruments MLA 900 Operating Instructions Manual Download Page 19](http://html.mh-extra.com/html/mba-instruments/mla-900/mla-900_operating-instructions-manual_1752521019.webp)
Handling
MLA 900 Operating Instructions V 2.0 8011381 © MBA Instruments GmbH
19
4.2
Fault/limit value displays
BAT
(shown on both displays)
Meaning
Measures/instructions
The life of the built-in battery is almost over.
The battery voltage is lower than 8 V
(new battery: 9 V).
b
▲
~
Meaning
Measures/instructions
The measuring probe is outside the liquid.
b
Immerse the measuring probe in the
liquid.
The conductivity of the sample solution is
lower than
50
pS/m.
b
Observe the safety rules and carry out
the measures laid down for this case.
▲
~
1
xxx + constantly changing temperature measuring valuet
Meaning
Measures/instructions
The probe cable is broken.
b
Carry out a performance test (
).
b
If unsuccessful:
change the probe
cable. Then carry out another
performance test.
Measuring probe is badly contaminated or
moist (splashed with water).
b
Clean and dry the measuring probe
(
WARNUNG: Risk by damaged cable
b
Do not operate the instrument in hazardous locations if the probe cable is
damaged or defective.
b
Only change the probe cable outside hazardous locations.
1
Meaning
Measures/instructions
Measuring value is greater than
1999
pS/m.
b
Check whether the conductivity of the
liquid can actually be greater than
1999 pS/m.
Measuring probe is badly contaminated or
moist (splashed with water).
b
Clean and dry the measuring probe
(
MLA 900 is damaged.
b
Carry out a performance test (
).
Summary of Contents for MLA 900
Page 4: ...Contents 4 MLA 900 Operating Instructions V2 0 8011381 MBA Instruments GmbH ...
Page 14: ...14 MLA 900 Operating Instructions V2 0 8011381 MBA Instruments GmbH Preparing for operation ...
Page 34: ...34 MLA 900 Operating Instructions V2 0 8011381 MBA Instruments GmbH Storage transport ...