21
PATENTS PENDING
MANUAL PUMP OPERATION
LOADING & UNLOADING OCCUPANT
OPERATING INSTRUCTIONS - Continued
1. Reposition latches to manually unfold the Lift as
follows. Raise latch off anchor pin
(FIG. 21-2B)
on LH
side of Lift. Position the standoff to hold latch in place
above the anchor pin
(FIG. 21-2B)
. Repeat for latch
on RH side of Lift.
LIFT - BACK VIEW
FIG. 21-2A
REPOSITIONED
LATCH &
STANDOFF
FIG. 21-2B
LATCH
ANCHOR PIN
STANDOFF
NOTE:
If possible, keep the Lift power
ON/OFF
switch
turned
ON
. In most cases, operating the Lift with
Manual Pump may be easier if power is
ON
.
Manual pump operating instructions for the Lift
are also located on Pump Cover. See
DECALS
AND DECAL PLACEMENT
in this manual.
If possible, apply power to
the Lift by turning
ON
switch on the Pump Cover
(FIG. 21-1)
. The switch
is illuminated when
turned
ON
.
POWER SWITCH
(LH PUMP SHOWN)
FIG. 21-1
PUMP
COVER
Summary of Contents for WL7
Page 2: ...PATENTS PENDING ...
Page 11: ...11 PATENTS PENDING DECAL SET P N 266704 01 FIG 11 1 ...
Page 20: ...20 PATENTS PENDING THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 29: ......