12
Operation test:
Power on: Connect all 4/6 columns with communication cables as shown above, turn the Mode
Selection knob to SINGLE, and power on main column and all slave columns. LCD screen will
show work interface after successful connection.
Rise:
Unloaded
, press and
hold the “UP” button on the master control box, check if the carriage
rises normally. Repeat to try the other columns in same way
Press and hold the “UP” button and allow the carriage to rise to its highest position. Check for any
hydraulic leaks.
Emergency stop: Press the red emergency button to stop the lift. Turn red button to the right to
release it after testing to see if the columns have stopped.
Lower: Press and hold the “DOWN” button, the carriages go down to the required height after the
safety locks have disengaged automatically.
“PAIR” or “ALL” columns test:
Power on: Connect all 4/6 columns with communication cable according to Fig.1 or Fig. 2, turn
the Mode Selection knob to PAIR or ALL mode, and power on main column and all slave
columns. LCD screen will show work interface after successful connection.
Rise: Unloaded, press and hold the “UP” button at the master control box, check if all the
corresponding carriages can rise normally.
Emergency stop: Press the red emergency button to stop the lift. Turn red button to the right to
release it after testing to see if the columns have stopped.
Lock: Press and hold this button, the carriage will slightly go down and will lock into the closest
safety lock.
Use the lock button every time you operate the lifts.
Lower: To lower you must raise lifts a few inches for the safety locks to disengage then press and
hold the “DOWN” button, the carriages go down to the required height after the safety lock
disengage.
After you have read and understand all of the information in this manual
and finished the operations testing you are ready to proceed to lifting
vehicles.
All technicians that will be using this equipment MUST
read and understand all of the safety and operation items in this
manual
.