MAUTING Junior 03 Operating Instructions Manual Download Page 14

Smokehouse MAUTING Junior

Date:

1.7.2006

Worked out:

Fila Petr

Checked by:

Bielak Antonin Ing.

Approved by:

Bielak Antonin Ing.

Version No: 3

Page:

14 of 22

Instruction manual

Chart  2.

RO

A

S

T

E

D

 M

E

A

T

Flap opening in %

Temperature 

in chamber 

[°C]

Temperature 

in core [°C]

Time 

[min]

Outlet

Fresh air 

ROASTING

160

72

0

0

ROASTING

160

60

0

0

VENTILATION

2

100

100

4. INSTALLATION OF CHAMBER

Smoking chamber Junior is delivered to customer in an assembled state on a wooden 
palette and wrapped in stretch foil.

1. Chamber is transported as close as possible to the destination and is unpacked.

2. Machine is moved to the place. If the chamber has wheels, the front ones are fixed 

up (floor has to be even in the chamber positioning).

3. Cable with plug ((3x380V/220V) will be connected to a socket (32 A), that was 

prepared by the customer before delivery.

4. It will be made a water connection to distribution piping with a pressure hose into 

connecting nut (G 1/2“) in the rear part of the chamber and nut of the distribution 
piping, which is equipped with a stop-valve. The customer prepares this 
connection before delivery.

5. Connection to the drain is made with hose (DN 20) and with hose socket (G ¾“) in 

the chamber floor. End of the hose will be placed directly to the drain outlet or 
close to it to make sure that sewage water flows directly to the drain. 

6. Smoke outlet will be made by stainless steel piping and knees or a flexible hose 

(made of aluminium or inox). This piping or hose will be connected to the smoke 
output (

Ø

100) in the upper part of the chamber. 

7. After installation will be verified all functions of the chamber according to the 

already made procedure.

a) Switch on the main power switch. Display shows the initial state.

Example:

temperature in chamber

020

core temperature sensor

019

time

00:00

program step number

-- --

Summary of Contents for Junior 03

Page 1: ...Operating Instructions Smoking Chamber Junior 03 Production Number 081 11 Year of Production 2011...

Page 2: ...cleaning and troubleshooting 5 2 8 Warning labels placement 6 2 9 List of safety devices and their role 6 3 TECHNICAL DESCRIPTION 7 3 1 Operation conditions 7 3 2 Technical parameters 7 3 3 Descripti...

Page 3: ...to be permanently placed in the process room is designed for a qualified stuff contents the most important advices and warnings concerning the putting in operation and maintenance of the equipment 2 G...

Page 4: ...nd grease on the floor be aware of the slipping hazard If you doubt about the manufacturing process contact the responsible person The equipment can be run only if all safety accessories are fully wor...

Page 5: ...Pay attention to the high temperature in the chamber smoke generator and smoke outlet 2 7 Safety regulations by maintainanace cleaning and troubleshooting Maintenance has to be provided by a qualified...

Page 6: ...ese warning labels In case of damage or illegibility of any contact the manufacturer 2 8 Warning labels placement This machine is equipped by a safety accessory that protects operator and device The m...

Page 7: ...and connection places are stated in the project drawing 3 2 Technical parameters Total electrical power consumption 10 8 kW Input of heating element in smoke generator 0 7 kW Input of heating elements...

Page 8: ...h tray and below the box with wooden chips The smoke generator is placed in the bottom part of the chamber Smoke is created by glowing wooden chips of hard wood on the red hot heating element with the...

Page 9: ...t side of the control unit is the main power switch smoking and humidification breaker By the control unit keyboard is possible to control the smoking chamber Junior it means start of programs changes...

Page 10: ...els Showering 3 4 Material All parts are made of carbide nickel stainless steel Internal insulation is made of mineral wool in thickness 30 mm except the floor and ceiling where it is 20 mm Smoke gene...

Page 11: ...ual for control unit operator see the chart No 2 settings of approximated times and temperatures for individual steps Set flaps by the flap handlers see chart No 1 Flap settings Push the button START...

Page 12: ...te the program by switching off the main power switch and start again In the following chart is shown the flap settings in particular phases of heat treatment The settings are possible to change accor...

Page 13: ...65 20 100 100 SMOKING 68 20 25 0 COOKING 75 72 0 0 VENTILATION 2 100 100 SAUSAGES Flap opening in Temperature in chamber C Temperature in core C Time min Outlet Fresh air REDDENING 58 20 0 0 DRYING 65...

Page 14: ...customer before delivery 4 It will be made a water connection to distribution piping with a pressure hose into connecting nut G 1 2 in the rear part of the chamber and nut of the distribution piping...

Page 15: ...ible to teach in the stuff directly bat the customer 5 ACCEPTANCE DELIVERY Acceptance every smoking chamber Junior is tested by the manufacturer manufacturer is obliged to appeal the customer to the m...

Page 16: ...vent troubles with smoking and cleaning Keep safety regulations issued by manufacturers of the equipment and detergent by cleaning see the safety orders 8 1 Technological process of chamber cleaning 1...

Page 17: ...chamber or take them out and wash them separately 3 After washing give the drawer and ash tray back 4 Pay attention during this operation the heating element could burn you 9 MAINTAINACE AND TROUBLES...

Page 18: ...den chips in drawer Fill in wooden chips Heating element does not work Check heating element and parts of switchboard Low density of smoke Dirty bottom of the wooden chip drawer Clean smoke generator...

Page 19: ...up fan will stop Switch on and off the main power switch Temperature sensor in chamber is damaged Exchange temperature sensor in chamber Control unit is damaged Contact manufacturer Temperature is 5...

Page 20: ...M MB BE ER R P P 3 30 00 00 0W W U U 4 40 00 0V V 6 6 S SO OL LE EN NO OI ID D V VA AL LV VE E D D2 26 63 3D DV VN N 1 1 4 4 U U 2 23 30 0V V S Sp pi ir ra ax x S Sa ar rc co o 8 8 T TE EM MP PE ER RA...

Page 21: ...European Union 98 37 ES from 22 6 1998 Standard SN EN ISO 12100 1 Machine equipment safety basic notions general rules for projection Part 1 Basic terminology methodology Standard SN EN ISO 12100 2 Ma...

Page 22: ...rd some events of machine These data could help the customer and also the manufacturer solving possible troubles occurring by usage of the equipment For example date of the first start of the machine...

Reviews: