23
STEP 3
| PREMIUM KIT ASSEMBLY INSTRUCTIONS & NOTES
PART 8: PREMIUM KIT ASSEMBLY
1. Remove and discard hole caps using caution not
to scratch the paint.
2. Attach plug to Rep Counter.
3. Assemble Towel Hook (3P) and Rep Counter
(2P) using the M8 X 35L SHC bolts provided.
4. Torque bolts to 17 N-m/147 in-lbs.
Rep Counter wires must be
routed through the center of
the Towel Hook
Rep Counter
ASSEMBLY
Summary of Contents for VS-S70
Page 1: ...OWNERS MANUAL Versa Single Station Strength VS S70 Leg Press ...
Page 7: ...7 MARKINGS WARNING LABEL LOCATIONS ...
Page 26: ......
Page 27: ......