
Maintenance
Page 14
Attention!
Properly reattach all protective devices that have been dismounted after
executing the maintenance tasks.
Note!
After the first 20 hours of operation check all screw and bolt connections.
Subject the implement to regular maintenance.
Use multi-purpose grease to lubricate the moving parts.
7.2
Maintenance
At regular intervals, and always at the beginning and end of the season, the moving parts
of the implement must be greased or oiled.
7.2.1
Front auger and deflector group
After ending work any snow remaining in the turbine must be removed with the aid of the
provided wooden rod, and you must check whether the screws for the blade (A) and the
holder of the deflector group (B) are firmly seated (B).
Fig. 12: Front auger and deflector group
Check whether the augurs and the throw blades turn freely, otherwise you must check
whether the bearings and the side holders (C) are still intact.
If during use you determine that you have hit a rock or other object, you must check
whether the augurs and the throw blades have become deformed, if they have the
defective parts must be replaced to prevent imbalance and machine vibration.
If unusual vibration occurs on the machine, the cause must be identified and rectified
immediately; do not, under any circumstances, continue working