matev SBL-M 12-40C Original Operating Manual Download Page 1

matev GmbH 

Nürnberger Str. 50 
90579 Langenzenn, Germany 
T +49 9101 9087 -0 
F +49 9101 9087 -20 
[email protected]  
www.matev.eu 

Version 12/2017 

Original Operating Manual

Snow Blower 

SBL - M 12-40 QH 

– JD Quick Hitch 

SBL - M 12 

– 40C  

SBL - M 14 

– 40C 

Carefully read this manual all the way through before using the machine.

Summary of Contents for SBL-M 12-40C

Page 1: ...many T 49 9101 9087 0 F 49 9101 9087 20 info matev eu www matev eu Version 12 2017 Original Operating Manual Snow Blower SBL M 12 40 QH JD Quick Hitch SBL M 12 40C SBL M 14 40C Carefully read this man...

Page 2: ...2 Installation of the universal joint shaft 10 5 2 1 Adaptation of the universal joint shaft 10 5 2 2 Mounting the universal joint shaft 11 6 Operation 12 6 1 Working with the snow blower 12 6 2 Adjus...

Page 3: ...to refer to important information and handling instructions as needed Listings with bullet points are marked as follows Text Text Text Handling instructions are marked in the sequence in which they sh...

Page 4: ...th these tasks and who have been instructed in the hazards Moreover intended use includes exclusive use of original spare parts and supplemental equipment or use of such parts and equipment that meet...

Page 5: ...p Ensure sufficient visibility Fluids hydraulic oil escaping under high pressure can penetrate the skin and cause severe injuries Seek medical attention immediately danger of infection Always execute...

Page 6: ...ing manual before commissioning the machine Danger entanglement Danger of hand or arm injuries Ensure that the complete machine is at standstill before you approach it Danger due to ejected objects Al...

Page 7: ...on the tractor as a front attachment is driven by the tractor via a universal joint shaft The throw direction of the machine can be rotated hydraulically The baffle plate for setting the throw distan...

Page 8: ...ballast to prevent the vehicle from tipping In the movement phase the load on the equipment must be at maximum of 400 mm above the ground so that the vehicle does not lose stability 5 1 Mounting the s...

Page 9: ...nding on the tractor size The attachment can also be shifted in length Fig 4 Attachment of the snow blower The connection between coupling support and attachment must be secured against uncoupling of...

Page 10: ...riginal manual provided by the manufacturer of the universal joint shaft The safety and maintenance instructions that are contained in the operating manual provided with the universal joint shaft must...

Page 11: ...ocking disk that is on the outer side and keep it depressed 2 Slide the splined shaft onto the splined shaft of the PTO shaft 3 Release the lock disk 4 Slightly move the universal joint shaft back and...

Page 12: ...manufacture accepts no liability in such cases of injury or damage 1 Lower the snow blower 2 Switch the hydraulics to the float setting 3 Bring the throw out tower into the desired position 4 Switch o...

Page 13: ...st be kept several centimeters above the ground to prevent rocks or other material from accumulating through the front auger 7 Maintenance 7 1 General information Attention Personal injury or damage t...

Page 14: ...urbine must be removed with the aid of the provided wooden rod and you must check whether the screws for the blade A and the holder of the deflector group B are firmly seated B Fig 12 Front auger and...

Page 15: ...ncy class 2 mineral grease applied with a grease gun With the tower tilted back grease the continuous flight screw D Fig 14 Throw out tower If the tower opening is clogged the following must occur 1 T...

Page 16: ...be changed at operating temperature To do this remove the two plugs located below and on the filler neck B top up with oil type VANGUARD HCZ 80W90 API GL3 up to position C Changing the oil for the fi...

Page 17: ...oden rod to remove the snow Tractor does not work effectively with the snow blower Check all moving parts for ease of movement tractor power is insufficient for the machine The tower does not turn Rot...

Page 18: ...n is on the type plate of the implement Article number Chassis number 8 Disposal The implements must be disposed of in accordance with the applicable regulations of the municipality or the country Tak...

Page 19: ...mm Auger diameter 400 mm 400 mm Throw blade diameter 390 mm 395 mm Input speed 2000 rpm 2000 rpm Oil quantity required for tower regulation at least 6 liters min max 25 liters Oil pressure required f...

Page 20: ...off the universal joint shaft 10 Fig 8 Saw off the profile tube Fig 9 Deburr the sawn edges 11 Fig 10 Grease the profile tube 11 Fig 11 Allow the locking disk to lock in place 11 Fig 12 Front auger an...

Page 21: ...The manufacturer matev GmbH N rnberger Str 50 90579 Langenzenn that the machine SBL M 12 40 QH JD Quick Hitch SBL M 12 40C SBL M 14 40C complies with the provisions of the Machinery Directive 2006 42...

Reviews: