INSTALLATION
19
13
Continue with section 4.8 for commissioning
of the ChargeMaster.
11
Check all wiring; see also figure 7 for wiring
details.
12
Close the connection compartment by fixing
the four screws.
9
Option: Connect the ChargeMaster to the
MasterBus network. See chapter 6.
10
The factory setting of the ChargeMaster is
optimal for most installations. In some
applications however, it is desirable to
change these settings. See section 5.1 for
adjustment.
Use a small screw driver for adjustment of
the DIP-switches.
8
Attach the battery temperature sensor to the
casing of battery bank 1.
Plug the temperature sensor cable into the
“temp.sensor” jack.
7
Option: Connect the DC-wiring of the second
and third battery bank. These battery banks
should have a common negative with the
main battery (see figure 7).