
INSTALLATION PREPARATION
INSTALLATION PREPARATION
Before beginning assembly of the product, make sure all parts are present. If any part is missing or
damaged, do not attempt to assemble the product. Contact customer service for replacement parts.
Estimated Installation Time (new installation): 30–60 minutes
Tools Required for Assembly (not included): Wrench, Pliers, Cross-head Screwdriver, Thread Tape,
PVC Purple Primer, and PVC Cement
DETERMINING THE DEPTH OF WELL
Using a weight tied to a string, determine the depth of the well by dropping the weight down the
well, and then:
• Measure the ground level mark to where the string is wet. This is your well's water level.
• This number must be 10' (3 m) under the pump's normal pumping level.
• Subtract 5' (1.5 m) from this measured water level number. This number must be less than
25' (7.6 m).
• See Step 3 of Installation Instructions for a diagram.
Accessories Required for Assembly (not included):
1 1/4" (3.2 cm) and 1" (2.5 cm) PVC adaptors
1 1/4" (3.2 cm) and 1" (2.5 cm) PVC pipes
1" (2.5 cm) sealing gasket
Relief valve
Drain valve
1" (2.5 cm) MNPT x 1 1/4" (3.2 cm) SLIP PVC adaptor
1 1/4" (3.2 cm) single drop well seal
1" (2.5 cm) flexible joint
1 1/4" (3.2 cm) foot valve
7
Summary of Contents for 062-3415-8
Page 2: ...2 ...