Henan Master Machinery Co., Ltd
Tel:(+86)17737606271
www.mastermachinerys.com
27
Solution
:
Suggest to use the concrete vibrator, then use the machine
to leveling.
4.The ground plane less than expected value after leveling.
Reason
:
With different slump concrete, the after vibrating
concrete slump is different.
Solution
:
Adjust leveling elevation according to the worker’s
experience.
4. Not working of the electrical components
Reason
:
The cable falls off or wrong cable connection.
Solution
:
Reconnect the cable.
6. Generators cannot start
Reason
:
The temperature is too high or the temperature of the
generator body is too high, degree of throttle is too
small; The temperature is too low, and the degree of
throttle is too big.
Solution
:
Adjust the degree of the throttle.