EN
15psi for this product.
j.
A
fter inflation, tighten the valve cap.
O
nly the valve cap can
ensure final air tightness.
4.
F
in installation
T
he two side fins are fixed on the product.
O
nce the board is inflated,
slide in the middle fin to the base and insert the fixed pin.
5.
Inflation tips and precautions
DO N
OT use an air compressor.
D
amage to your board caused by over
inflation from an air compressor is not covered by our warranty.
A
fter 2 or 3 days there may be a small decrease of pressure due to
temperature change . if so, add a few pumps of air.
Before und
ertaking a long paddle, inflate the board for a full 24 hours
to make sure the board is airtight.
I
f you are seeing a consistent
decrease in air pressure, follow the instructions for leak detection in
the board repair section of this manual.