background image

Operation

Operation

Operation

Operation

Tighten

Tighten

Tighten Fasteners

Fasteners

Fasteners

Before using the pump, check and
retorque all external fasteners. Follow

Torque Instructions, page 10

After the first

day of operation, retorque the fasteners.

Pump

Pump

Pump Head

Head

Head CO

CO

CO

2

2

2

Charging

Charging

Charging

In the event of a diaphragm rupture, vapor will
enter the pump head center section. To avoid fire
and explosion, always replace air in the center
section with CO

2

.

Prior to using the pump, it is necessary to replace all
air in the center section with CO

2

. The pump head

center section drives the pumping with the CO

2

gas

charge. To ensure no air is present, use the following
method.

1.

At the CO

2

port (E), close the center section vent

valve.

2.

At the CO

2

port (E), open the CO

2

supply line

valve and adjust the CO

2

regulator to set the CO

2

to the maximum pressure setting of 150 psi.

3.

Close the CO

2

supply line valve and open the

center section vent valve.

4.

Repeat steps 1–3 a second time to purge any
remaining air.

5.

Repeat steps 1 & 2 to place the pump in
operational state.

The maximum pumping pressure will be a few psi
less than the internal CO

2

pressure setting.

Running

Running

Running the

the

the Pump

Pump

Pump

1.

Be sure the system is properly grounded. See

Grounding, page 7

.

2.

Check fittings to be sure they are tight. Tighten
inlet and outlet fittings securely.

3.

Run the pump; starting, stopping, and operating
process valves according to the extractor system
instructions.

Pressure

Pressure

Pressure Relief

Relief

Relief Procedure

Procedure

Procedure

Follow the Pressure Relief Procedure
whenever you see this symbol.

This equipment stays pressurized until pressure is
relieved manually. To help prevent serious injury
from pressurized vapor, follow the Pressure Relief
Procedure when you stop pumping for an extended
period of time, and before you clean, check, or
service the equipment.

1.

Remove electric power from the system.

2.

Vent all LP-Gas vapor from the pump and hoses
according to extractor system instructions.

3.

Close the shutoff valve on the CO

2

cylinder.

4.

On CO

2

port (E), open the pump CO

2

bleed valve

and CO

2

supply valve.

NOTE:

NOTE:

NOTE: In the event of a diaphragm rupture,
LP-Gas may be present in the pump center
section. Always vent all LP-Gas according to
extractor system instructions.

5.

If performing repairs, remove CO

2

regulator and

tank from the pump prior to performing the work.

Pump

Pump

Pump Shutdown

Shutdown

Shutdown

Before you check, adjust, clean, or repair the system,
follow the

Pressure Relief Procedure, page 9

.

3A6887A

9

Summary of Contents for 25M869

Page 1: ...s Recovery Electric Powered Dual Diaphragm Hazardous Location Motor Stainless Steel Wetted Parts Rated MAWP LPG 375 PSI For professional use only Important Safety Instructions Read all warnings and in...

Page 2: ...ief Procedure 9 Pump Shutdown 9 Maintenance 10 Maintenance Schedule 10 Tighten Threaded Connections 10 Flushing and Storage 10 Torque Instructions 10 Dimensions 12 Technical Data 13 MVP Standard Warra...

Page 3: ...urce All electrical wiring must be done by a qualified electrician and comply with all local codes and regulations WARNING FIRE FIRE FIRE AND AND AND EXPLOSION EXPLOSION EXPLOSION HAZARD HAZARD HAZARD...

Page 4: ...heet SDS from distributor or retailer Turn off all equipment and follow the Pressure Pressure Pressure Relief Relief Relief Procedure Procedure Procedure when equipment is not in use Check equipment d...

Page 5: ...touch hot equipment PERSONAL PERSONAL PERSONAL PROTECTIVE PROTECTIVE PROTECTIVE EQUIPMENT EQUIPMENT EQUIPMENT Wear appropriate protective equipment when in the work area to help prevent serious injury...

Page 6: ...P Parts and Accessories Be sure all accessories are adequately sized and pressure rated to meet the system s requirements Reference letters in the text for example A refer to the callouts in the figur...

Page 7: ...ON OFF ON OFF ON OFF switch switch switch or or or motor motor motor starter starter starter Ground through a proper connection to the electrical system Refer to the manufacturer s instructions for gr...

Page 8: ...s follows 1 Open the motor s electrical box 2 Install wiring system with proper connections to the motor electrical box A C1D1 installation requires conduit or armored cable with sealing fittings in a...

Page 9: ...Running Running Running the the the Pump Pump Pump 1 Be sure the system is properly grounded See Grounding page 7 2 Check fittings to be sure they are tight Tighten inlet and outlet fittings securely...

Page 10: ...owest possible pressure Flush before first use Flush at the lowest pressure possible Check connectors for leaks and tighten as necessary Flush with a fluid that is compatible with the LP Gas being dis...

Page 11: ...Notes Notes Notes Notes 3A6887A 11...

Page 12: ...Dimensions Dimensions Ref Inches cm A A A 17 0 43 2 B B B 46 4 117 9 C C C 39 0 99 1 D D D 8 5 21 6 E E E 22 8 57 9 F F F 9 6 24 4 G G G 14 9 37 8 H H H 12 0 30 5 J J J 10 2 25 9 K K K 14 5 36 8 L L L...

Page 13: ...sumption 0 2 scfh 0 006 cubic meters hour CO2 inlet size 1 4 in npt f Maximum pump speed 174 cpm Process Inlet and Outlet Size 1 in JIC male Optional pressure gauge ports inlet and outlet 1 4 in npt f...

Page 14: ...ion for breach of warranty must be brought within two 2 years of the date of sale MVP MVP MVP MAKES MAKES MAKES NO NO NO WARRANTY WARRANTY WARRANTY AND AND AND DISCLAIMS DISCLAIMS DISCLAIMS ALL ALL AL...

Reviews: