LP-Gas vapor recovery rate

18 cfm

5 m

3

/min

Butane recovery rate

3-4.5 lb/min

1.3-2 kg/min

Butane recovery and re-condense rate

35-50 GPH

135-200 L/hour

Propane recovery rate

4-6 lb/min

1.8-2.5 kg/min

Propane recovery and re-condense rate

50-70 GPH

180-270 L/hour

Maximum pumping outlet pressure

150 psi

1.03 MPa, 10.3 bar

Maximum pumping inlet vacuum produced

27 inHg

91 kPa, 0.91 bar

Maximum center section CO

2

charge

150 psi

1.03 MPa, 10.3 bar

Equipment Withstand Pressure

375 psi

2.59 MPa, 25.9 bar

Maximum CO

2

consumption

<0.2 scfh

<0.006 cubic

meters/hour

CO

2

inlet size

1/4 in. npt(f)

Maximum pump speed

174 cpm

Process Inlet and Outlet Size

1 in. JIC male

Optional pressure gauge ports: inlet and outlet

1/4 in. npt(f)

Weight

360.5 lb

163 kg

Electric

Electric

Electric Motor:

Motor:

Motor: Explosionproof

Explosionproof

Explosionproof for

for

for hazardous

hazardous

hazardous areas

areas

areas (see

(see

(see approvals

approvals

approvals page)

page)

page)

Model MVP-150-3PH, inverter rated

Power

5 Hp

3.7 kW

Speed

1800 rpm (30 Hz)

Gear Ratio

100.4:1

Voltage

3–phase 208-230/460V

Maximum Amperage Load

13.1 A (716V) / 6.6 A (565V)

Noise

Noise

Noise Data

Data

Data

Sound Power (measured per ISO-9614–2)

88.5 dBa

Sound Pressure [tested 3.28 ft (1 m) from equipment]

80.5 dBa

Materials

Materials

Materials

Process Pressure Section and Reed Valves

stainless steel

Diaphragms

PTFE

Process Vapor Temperature Range

-40°F to 220°F (-40°C to 104°C)

3A6887A

13

Summary of Contents for 25M869

Page 1: ...s Recovery Electric Powered Dual Diaphragm Hazardous Location Motor Stainless Steel Wetted Parts Rated MAWP LPG 375 PSI For professional use only Important Safety Instructions Read all warnings and in...

Page 2: ...ief Procedure 9 Pump Shutdown 9 Maintenance 10 Maintenance Schedule 10 Tighten Threaded Connections 10 Flushing and Storage 10 Torque Instructions 10 Dimensions 12 Technical Data 13 MVP Standard Warra...

Page 3: ...urce All electrical wiring must be done by a qualified electrician and comply with all local codes and regulations WARNING FIRE FIRE FIRE AND AND AND EXPLOSION EXPLOSION EXPLOSION HAZARD HAZARD HAZARD...

Page 4: ...heet SDS from distributor or retailer Turn off all equipment and follow the Pressure Pressure Pressure Relief Relief Relief Procedure Procedure Procedure when equipment is not in use Check equipment d...

Page 5: ...touch hot equipment PERSONAL PERSONAL PERSONAL PROTECTIVE PROTECTIVE PROTECTIVE EQUIPMENT EQUIPMENT EQUIPMENT Wear appropriate protective equipment when in the work area to help prevent serious injury...

Page 6: ...P Parts and Accessories Be sure all accessories are adequately sized and pressure rated to meet the system s requirements Reference letters in the text for example A refer to the callouts in the figur...

Page 7: ...ON OFF ON OFF ON OFF switch switch switch or or or motor motor motor starter starter starter Ground through a proper connection to the electrical system Refer to the manufacturer s instructions for gr...

Page 8: ...s follows 1 Open the motor s electrical box 2 Install wiring system with proper connections to the motor electrical box A C1D1 installation requires conduit or armored cable with sealing fittings in a...

Page 9: ...Running Running Running the the the Pump Pump Pump 1 Be sure the system is properly grounded See Grounding page 7 2 Check fittings to be sure they are tight Tighten inlet and outlet fittings securely...

Page 10: ...owest possible pressure Flush before first use Flush at the lowest pressure possible Check connectors for leaks and tighten as necessary Flush with a fluid that is compatible with the LP Gas being dis...

Page 11: ...Notes Notes Notes Notes 3A6887A 11...

Page 12: ...Dimensions Dimensions Ref Inches cm A A A 17 0 43 2 B B B 46 4 117 9 C C C 39 0 99 1 D D D 8 5 21 6 E E E 22 8 57 9 F F F 9 6 24 4 G G G 14 9 37 8 H H H 12 0 30 5 J J J 10 2 25 9 K K K 14 5 36 8 L L L...

Page 13: ...sumption 0 2 scfh 0 006 cubic meters hour CO2 inlet size 1 4 in npt f Maximum pump speed 174 cpm Process Inlet and Outlet Size 1 in JIC male Optional pressure gauge ports inlet and outlet 1 4 in npt f...

Page 14: ...ion for breach of warranty must be brought within two 2 years of the date of sale MVP MVP MVP MAKES MAKES MAKES NO NO NO WARRANTY WARRANTY WARRANTY AND AND AND DISCLAIMS DISCLAIMS DISCLAIMS ALL ALL AL...