background image

3

Wall Construction

Your Over-the-Range microwave oven should be mounted against and supported by a flat, vertical wall. Wall construction should be
a minimum of 2” x 4” wall studding and 3/8” or more, thick drywall or plaster/lath. The oven must be attached to a minimum of one
2” x 4” wall stud.

For proper installation the wall must be capable of supporting the cabinet load plus a minimum of 135 pounds, (the 85 pound weight
of the microwave oven and load weight allowance of 50 pounds.) To find studs, use one of the following methods:

Outside ventilation requires HOOD
EXHAUST DUCT. Read the following
carefully.

EXHAUST CONNECTION: The hood
exhaust has been designed to mate with a
standard 3-1/4” x 10” rectangular duct.

If round duct is required, a rectangular-to-
round transition adapter must be used. Do not
use less than a 6” diameter duct.

REAR EXHAUST: If rear or horizontal

exhaust is to be used, care should be taken to
align exhaust with space between studs, or wall
should be prepared at the time it is constructed
by leaving enough space between wall studs to
accommodate exhaust.

MAXIMUM DUCT LENGTH: For
satisfactory air movement, the total duct length
of 3-1/4” x 10” rectangular or 6” diameter
round duct should not exceed 140 feet of
equivalent duct run.

ELBOWS, TRANSITIONS, WALL AND
ROOF CAPS, etc.,
present additional resistance to air flow and are
equivalent to a section of straight duct which is
longer than their actual physical size. When
calculating the total duct length add the
equivalent lengths of all transitions and
adaptors plus the lengths of all straight duct
sections. The diagram below shows the
approximate feet of equivalent length of some
typical ducts.

Hood Exhaust Duct

3/8” Drywall or
Plaster / Lath

Usually 16" or 24"

2” X 4”
wood stud or
metal stud
(25 gauge or thicker)

Lag screws must be installed
in these area

I. Stud finder-a magnetic device which locates nails.

II.Using a hammer, tap lightly across the mounting surface

to find a solid sound. This will indicate a stud
installation. After locating the stud(s), the center can be
found by: Probing the wall with a small nail to find the
edges of the stud and then placing a mark half way
between the edges. The center of any adjacent studs
should be 16” or 24” from this mark.

III. Draw a line down the center of the studs.

Roof Cap (24Ft)

90˚ Elbow (10Ft)

45˚ Elbow (5Ft)

Rectangular-to-Round

Transition Adaptor (5Ft)

Wall Cap (40Ft)

90˚ Elbow (25Ft)

Summary of Contents for MCO160UWF

Page 1: ...is kilowatt rating The power supply cord and plug should be brought to a separate 20ampere branch circuit single grounded receptacle The outlet box should be located near the cord entry point The outl...

Page 2: ...If you are going to vent your microwave oven to the outside see exhaust duct preparation 4 Designed to be installed in 30 wide cabinet opening 66 or more from the floor to the top of the microwave ov...

Page 3: ...For satisfactory air movement the total duct length of 3 1 4 x 10 rectangular or 6 diameter round duct should not exceed 140 feet of equivalent duct run ELBOWS TRANSITIONS WALL AND ROOF CAPS etc pres...

Page 4: ...ION Do not pull or stretch blower wiring Step 3 Roll the blower unit so that the fan blade openings are facing back rear of unit If you want VERTICAL roll the blower unit so that the fan blade opening...

Page 5: ...at least the thickness of the wall between the mounting plate and the end of the toggle nut in closed position If you do not leave this space the toggle nut will not open on the other side of the wall...

Page 6: ...e top cabinet Drill the holes following the instructions on the template Step 1 Protect the top of your range by placing a portion of the carton or some other heavy material over the cooking surface b...

Page 7: ...and attach the damper to blower motor cover by sliding it into the guides at the blower motor cover Be sure that the damper hinge is on the front and the damper swings free into the wall outlet Step...

Page 8: ...the Charcoal filter To remove the charcoal filter disconnect power at the main fuse or circuit breaker panel or pull the plug Remove the screws on the front of the grille and remove the grille Install...

Page 9: ...s Le cordon d alimentation lectrique et la fiche devraient tre conduits vers un r ceptacle raccord la terre sur une partie de circuit s par e 20 amp res Le bo tier de la prise secteur devrait tre situ...

Page 10: ...ext rieur consultez la pr paration de la conduite d vacuation 4 con u pour tre install dans une ouverture de placard de 30 76 20 cm de large OTR Espace de montage Vous trouverez ci dessous une liste...

Page 11: ...nduite rectangulaire de 3 1 4 8 26 cm x 10 52 40 cm ou de la conduite ronde de 6 15 24 cm de diam tre ne devrait pas tre sup rieure 140 pieds 4620 cm de conduites quivalente LES COUDES TRANSITIONS MUR...

Page 12: ...du couvercle Etape 4 Placez le ventilateur dans l ouverture puis fixez le au micro ondes avec la vis 3 de l tape 2 Fixez le Haut du bo tier du ventilateur sur le Ventilateur situ au dessous l aide de...

Page 13: ...e montage et l extr mit du boulon ailettes en position ferm e Si vous ne laissez pas cet espace le boulon ailettes ne s ouvrira pas de l autre c t du mur b Positionnez la plaque de montage sur le mur...

Page 14: ...es trous en suivant les instructions sur les tablettes tape 1 Prot gez le haut de votre cuisini re en pla ant une partie du carton d emballage ou tout autre mat riau lourd au dessus de la surface de c...

Page 15: ...tampon au couvercle du moteur du ventilateur en la faisant glisser dans les guides du couvercle du moteur du ventilateur V rifiez que la charni re du tampon se trouve en haut et que le tampon se bala...

Page 16: ...entation au niveau du fusible principal ou du tableau des coupe circuits ou tirez sur la prise Retirez les vis situ es l avant de la grille puis retirez celle ci Installez le filtre charbon Remettez l...

Reviews: