18
-Install the drain piping:
1.
Connect piping to the 90
elbow(s) at the bottom of the evaporator drain pan(s).
a.
Use a non-permanent thread
sealer because drain lines must
be capable of being removed for
future servicing.
-Seal the inside drainpipe hole with NSF
approved silicone sealant.
-Seal the remainder of drainpipe hole in blast
chiller wall with foam insulation.
1.
This will stop any airflow around the pipe
Summary of Contents for Master-Chill MCR-33-101PT
Page 2: ...2 ...
Page 57: ...57 EVFTFT818 REMOVABLE PROBE ASSEMBLIES EVFTFT818 ...