Mas Grup
12
11.7.5.
Open contact floater connection is as follows:
-
There are 3 cables, the brown and black ones will be used for connection. At the same time, firstly,
F0.15
parameter will be set as
02
after
that
F7.26
parameter will be set as
02
on the interface.
11.7.6.
Open contact liquid level electrode connection is as follows:
-
During the liquid level electrode connection, while a cable is connected to M2, a bridge contact is made from COM to inverter ground
connection. At the same time, firstly,
F0.15
parameter will be set as
02
after that
F7.26
parameter will be set as
02
on the interface.
11.7.7.
Open contact PTC sensor connection is as follows:
-
PTC connection will be made as seen above. At the same time, firstly,
F0.15
parameter will be set as
02
after that
F7.26
parameter will be
set as
02
on the interface.
11.7.8.
Open contact PTC sensor and floater connection in series is as follows: