
© Martin Engineering GmbH
11
M3735UK-09/15
Preparing for the installation
4
Preparing for the installation
4.1
Before the installation
4.1.1
Required materials and tools
Along with the standard tools, the following special equipment may
be needed for the installation and maintenance of your product.
• Lifting device with a capacity greater than the weight of the
belt cleaner (see delivery note for weight data).
4.1.2
Preparatory measures
1. Inspect the delivery for the following conditions:
• Is the delivery complete? Does the number of pallets/
crates/containers delivered match the number on the
delivery note?
• Do all of the transport packages appear to be undamaged?
Does damage to the packaging exist which indicates
damage to the product contained inside?
NOTE
Perform the inspections described carefully and completely.
The shipping company is liable for any transport damage!
Please contact the shipper with any damage claims.