PRE-INSTALLATION
1. The cabinet is packaged to minimize the risk of shipping damage. Immediately upon receipt,
make certain to inspect the cabinet for damage.
FILE ALL CLAIMS WITH THE FREIGHT
CARRIER.
2. Unpack and inspect the cabinet.
IF ANY CONCEALED DAMAGE, FILE ALL CLAIMS WITH
THE FREIGHT CARRIER.
FINAL INSTALLATION
1. Unpack cabinet and remove all protective paper or plastic covering from metal parts.
2. If applicable, make sure that the back air circulator plenum is well latched in place and plugged
in to the cabinet(s). (See photos on page 7.)
3. Place cabinet in the stable base.
4. Plug cabinet into 120v receptacle rated for 15 amps.
5. Installation shall comply with the latest version of the National Electrical Code, NFPA 70.
6. Wash and sanitize all parts before placing them in the cabinet.
OPERATION
The following is the user interface layout for each deck.
CONTROLLER POWER UP:
1. Upon power up, the controller will briefly show the software version and then go to preheat mode
and the display will show "PHt"
Left Channel Display
Right Channel Display
Left channel
timer start/stop
button
Right channel
timer start/stop
button
Temperature button
Up &
Down
Arrow
Buttons
LED Indicator Lights
Left
Channel
LED Indicator Lights
Right
Channel
On/Off
Switch