Marquee 0182364 Assembly Instructions Manual Download Page 4

Please read these instructions completely before starting assembly

Safety Advice

The gazebo must be positioned and fixed on a flat level surface.

Dispose of all plastic bags safely. Keep them out of the reach of children.

Keep children and pets away from the assembly area until the work is completed.

Always wear proper safety gear including work shoes, gloves.

Do not attempt to assemble the gazebo in medium windy or wet condition.

Do not place your gazebo in an area exposed to excessive wind.

If using power tools or a ladder, always follow the manufacturer safety instructions.

Hot items such as grills, blowtorches, heaters etc. must not be stored in the gazebo.

Do not cook or lit fireworks near the gazebo.

Avoid vandalism, abuse, falling or thrown objects, or accumulation of snow.

Tips:

     Please don't destroy boxes until completely assembled. 

              Do not tighten bolts immediately. You can install loose by cordless drill with Philips head. Adjust to make all 
              components in place before you tighten all screws by Philips Screwdriver.  Power tools may over tighten fittings.
              Cool temperature condition is recommended for easy assembly.
              Make sure you have all the necessary parts. The List of Parts has the corresponding step number referenced 
              to each part. We recommend that while you go through the list, make staging areas for each step and place the 
              parts necessary for each step in these areas. This will save you time and effort during assembly.

03 / 18

List of Parts..................................................................................................    1-2

Table of Contents.........................................................................................      

 

3

STEP 1   Assemble the Leg posts.....................................(ca. 5min)...........      

 

4

STEP 2   Assemble the Beams..........................................(ca. 5min)..........       5

STEP 3   Attach the Rails to the Beams............................(ca. 10min).........      6

STEP 4   Attach short Beams to the Leg posts.................(ca. 10min).........      7

STEP 5   Attach long Beams to the Leg posts..................(ca. 15min).........      

 

8

STEP 6   Install the Beam covers......................................(ca. 10min).........      9

STEP 7   Assemble four Corner ribs.................................(ca. 5min)...........     10

STEP 8   Put up Lower top plate and Corner ribs.............(ca. 15min).........     11

STEP 9   Install the Mid ribs..............................................(ca. 5min)...........     12

STEP 10  Install the Upper top plate.................................(ca. 5min)...........     13

STEP 11  Assemble the large Roof panels........................(ca. 20min).........     14

STEP 12  Put up the Roof panels.......................................(ca. 15min).........     15

STEP 13  Install Edge protectors and Rib caps.................(ca. 15min).........     16

STEP 14  Put up Fabric side panels and Mosquito nets....(ca. 10min).........     17

STEP 15  Secure the Gazebo to the ground.......................(ca. 5min)...........     18

Thank you for choosing the Havana Gazebo!

All steps can be completed by 4 people. The assembly take about two and a half hours.

Proper tools: Two ladders, Philips screwdrivers, Gloves, Spirit Level.

Note: Your gazebo is a non-permanent structure. It is designed for leisure use 

              and is not a shelter against adverse weather conditions.

Table of Contents

Summary of Contents for 0182364

Page 1: ...HAVANA GAZEBO Assembly Instructions 4 x 3 M Item number 0182364 WITH POLYCARBONATE ROOF...

Page 2: ...BEAM BEAM BEAM CORNER RIB MID RIB CURTAIN RAIL CURTAIN RAIL CURTAIN RAIL ROOF JOINT ROOF JOINT ROOF JOINT EDGE PROTECTOR EDGE PROTECTOR EDGE PROTECTOR STRENGTHEN BAR MID RIB CONNECTOR CORNER RIB CONN...

Page 3: ...e upper middle lower 1 4 5 8 11 12 13 11 12 11 12 13 11 12 4 5 7 9 10 13 List of Parts NOTE 1 The gazebo is shipped in two cartons These cartons are very heavy and require a mechanical aid to lift Be...

Page 4: ...Parts has the corresponding step number referenced to each part We recommend that while you go through the list make staging areas for each step and place the parts necessary for each step in these ar...

Page 5: ...mble the Leg posts TIPS Do not tighten bolts immediately install loose Adjust foot plate to make all screws are in place before you tighten all screws by hand Place the posts parallel to each other on...

Page 6: ...S Left the 2 middle holes of each beam connector not screwed for STEP 3 2 A Screw two bolts J to assemble the MID RIB CONNECTOR J onto the long BEAM B1 and B2 2 B Use BEAM CONNECTOR Q to combine the l...

Page 7: ...ams TIPS Make sure the MID RIB CONNECTOR J is between beams and rails Find all components in this step and place them on a level ground as shown 3 A Secure the short CURTAIN RAIL F and the MID RIB CON...

Page 8: ...sets of leg posts in opposite direction to raise the door frame easier Find all parts in this figure and place them on a level ground 4 A Combine the short BEAM C1 C2 and LEG POST A with 3 bolt T Use...

Page 9: ...for this step ATTENTION Find all components and long BEAM B1 B2 in this step 5 A Raise up two door frames of STEP 4 oppositely with rails inside 5 B Combine the long BEAM B1 B2 and LEG POST A with 3...

Page 10: ...ping screws W 6 B Assemble the MID BEAM COVER M onto the middle of beams with 4 tapping screws W Repeat the step until 8 beam covers are assembled To make your gazebo look better avoid leaving gaps be...

Page 11: ...sure the corner rib connectors in the correct position and direction as shown before tightening the bolts Find the longest CORNER RIB D and CORNER RIB CONNECTOR K place them parallel to each other on...

Page 12: ...U Now the upper structure looks like from top view 8 B Move this upper structure up to the lower frame 8 C Secure each CORNER RIB CONNECTOR K onto the LEG POST A with 2 bolts U Repeat on all corners T...

Page 13: ...of MID RIB E onto the LOWER TOP PLATE O with a bolt U Use the hole of MID RIB E closest to the outside 9 B Attach the other end of MID RIB E to the MID RIB CONNECTOR J on the beams by screwing a bolt...

Page 14: ...P PLATE M6 x 16 Install the Upper top plate Lift up the UPPER TOP PLATE P onto the LOWER TOP PLATE O Secure it with 3 bolts U bottom up through the lower plate ATTENTION The upper top plate is heavy u...

Page 15: ...l components in this step and place them on a non abrasive level ground Keep the words side facing up before assembling the large roof panels 11 A Connect left upper PANEL 1 and lower PANEL 2 with lef...

Page 16: ...anels into the groove of MID RIB E and CORNER RIB D as shown successively Use a rubber hammer to carefully tap each panel into the grooves ATTENTION Place the words side of the polycarbonate roof pane...

Page 17: ...nstall Edge protectors and Rib caps H H1 H1 H2 H2 13 A Insert the EDGE PROTECTOR H1 H H2 to ROOF PANEL 2 4 6 separately 13 B Secure the CORNER RIB CAP R to CORNER RIB D with a bolt U 13 C Secure the M...

Page 18: ...ito nets One piece mosquito net contains 14 hooks 6 hooks on the short side 8 hooks on the long side One piece side fabric side panel contains 12 hooks 5 hooks on the short side 7 hooks on the long si...

Page 19: ...ent for your surface Good work Your gazebo is ready for use TIPS Although stakes are supplied to suit soft ground you can also secure the gazebo to a concrete floor or a wood deck You may need to purc...

Reviews: