MGT 45M – 450M 1-1/2” SINGLE NXT2
OPERATION
20
FLOW DIAGRAMS
1. SERVICE POSITION
Hard water enters unit at valve inlet and
flows down through the mineral in the min
-
eral tank. Conditioned water enters center
tube through the bottom distributor, then
flows up through the center tube, around the
piston, and out the outlet of the valve.
2. BACKWASH POSITION
3. BRINE POSITION
Hard water enters unit at valve inlet, flows through piston, down
center tube, through bottom distributor, and up through the
mineral, around the piston and out the drain line.
Hard water enters unit at valve inlet, flows up into injector
housing and down through nozzle and throat to draw brine from
the brine tank, brine flows down through mineral and enters the
center tube through bottom distributor and out through the
drain line.
Summary of Contents for MGT 30M
Page 5: ...MGT 45M 450M 1 1 2 SINGLE NXT2 SYSTEM INFORMATION 2 ...
Page 22: ...MGT 45M 450M 1 1 2 SINGLE NXT2 OPERATION 19 MASTER PROGRAMMING STEPS SINGLE SYSTEM 4 2850 ...
Page 33: ...MGT 45M 450M 1 1 2 SINGLE NXT2 MAINTENANCE 30 1700 BRINE SYSTEM ASSEMBLY 28 29 ...
Page 46: ...MGT 45M 450M 1 1 2 SINGLE NXT2 43 NOTES ...
Page 47: ...MGT 45M 450M 1 1 2 SINGLE NXT2 44 NOTES ...
Page 48: ...8 640 ...