
39
Getting Set Up and Started
Preparations
The following components are required to get started:
60 VA power-supply unit, connecting cable between the power-supply unit and the Central Station,
connecting wires between the Central Station and the track layout, rolling stock and/or solenoid
accessories.
Connect the parts as shown in the following illustrations.
Connections to C Track or Connections to K Track or 1 Gauge feeder connection and/or
60173
B 0
B 0
B 0
B 0
power
Aux
60173
USB
Sx
B 0
prog
B 0
B 0
B 0
power
C Track Programming Track or K Track Programming Track or 1 Gauge programming track and/or
Connections to the Layout
60
17
3
B
0 B
Aux
60
17
3
US
B
Sx
Connections to the Programming Track
The programming track may not have any direct electrical contact with the layout, nor can it have
additional users (examples: lighting, turnout decoders, light track bumper, etc.) connected to it.
The programming track is required to read out, program, and process locomotive decoders.
The only possible connections are those shown!
0
0
0
B
B
B
0
0
0
B
B
B
Connecting the power supply to the Central Station
and calibrating the touchscreen (Display) when
turning the Central Station on the fi rst time.
The maker fi eld near this text appears in different positions (5 times)
on the display. Please confi rm this symbol by touching it with the
stylus
exactly in the middle.
The calibration procedure is ended after that and the locomotive
controller display will appear after a short time.
power
Aux
60
B
0
prog
B
0
B
0
B
0
Summary of Contents for Central Station 60215
Page 1: ...Central Station Controlling Switching Running ...
Page 7: ...43 Control Õ ÊUÊ ÌiÀ ÊUÊ ...
Page 18: ...54 Keyboard Ê ÌÀ ÊUÊ iÌÌ Ê1 ...
Page 23: ...59 Layout ià ÊUÊ ÌÀ Ê ...
Page 27: ...63 Memory Ê iÌÕ ÊUÊ ÌÀ ...
Page 30: ...66 Setup Ê iÊUÊ V Õ ÊUÊ iÌÌ Ã ...