![Market Forge Industries FT-12CG Installation, Operation & Maintenance Manual Download Page 7](http://html.mh-extra.com/html/market-forge-industries/ft-12cg/ft-12cg_installation-operation-and-maintenance-manual_1728052007.webp)
5
INSTALLATION
Installation Instructions
1. Uncrate carefully. Report any hidden freight damage
to the freight company immediately.
2. Ideally an exhaust system should be directly above
the appliance to exhaust combustion gases gener-
ated by the unit.
3. The appliance is intended for use on noncombustible
floors. The minimum clearance from combustible and
noncombustible floor construction is 0” on right side,
0” on left side and 6” (152 mm) from the back of the
flue chimney.
4. Appliance location must allow air supply to unit and
obstruction free clearance for air opening into the
combustion chamber.
5. Set the appliance in place and level using spirit level.
Level left to right and front to back.
6.
Mark hole locations on the floor through the anchor
-
ing holes provided in the flanged adjustable feet.
7. Remove the appliance from installation position and
drill holes in locations marked on the floor. Insert
proper anchoring devices. (Not supplied).
8. Place appliance back in the installation position and
Re-level left to right and front to back.
9.
Bolt and anchor appliance securely to the floor.
10.
Seal bolts and flanged feet with silastic or equivalent
compound.
11. Make service connections as indicated.
12. The pressure relief valve is located at the left rear of
the unit. This area should be kept clear and should
not be in an area where operators will normally stand.
The elbow on the relief valve should be turned toward
the floor. 3/4” diameter pipe may be used to extend to
the floor, but must not be piped directly to a drain. It
must be vented to the atmosphere.
13. Check the pressure gauge on the front panel before
operating. The reading should be in the green vacu-
um zone (below 0 PSI).