background image

*pre-installed screw

1200 table frame

: Hole (2) must match to the second hole before 

                                     tightening the screw.

*1400 table frame

*1200 table frame

1400 table frame

                                     tightening the screw.

B

A

B

C

D

B

The frame (B) is pre-assembled. Do not remove the carton box

until the leg is flip up. This is to prevent any further damages.   

Raise the legs, slide the frame outwards to fit desired size and fix 

it with the screw that are already pre-mounted in the frame.

Attach D to B and tighten it with screw (C) using Allen key.
Repeat this step on the other side of the leg.

Attach A to B and secure the screw using Allen key.
Repeat this step on the other side of the leg. 

Adjust the table length and secure the pre-installed screw using
Allen key.

The installation is completed.

B

carton block

carton block

1

2

3

4

5

6

A

Summary of Contents for MATRIX PRO

Page 1: ...Matrix Pro Single Manual 1003 _MAI_ Matrix Pro Single leveler leveler A B C D ...

Page 2: ...OOLS MANPOWER Manpower x2 OPTION 1 Power Tool x2 OPTION 2 Allen Key x2 Leveler Frame 1 A leveler leveler A B C D B C D E Component A x2 Component B x1 Component C x8 M6 x 15 screw Component D x2 Component E x2 JCH Screw only for table top ...

Page 3: ...y further damages Raise the legs slide the frame outwards to fit desired size and fix it with the screw that are already pre mounted in the frame Attach D to B and tighten it with screw C using Allen key Repeat this step on the other side of the leg Attach A to B and secure the screw using Allen key Repeat this step on the other side of the leg Adjust the table length and secure the pre installed ...

Page 4: ...markantoffice com 4 Table Top 2 Attach table top on the frame and secure it using E screw The installation of the table top is completed E ...

Page 5: ...markantoffice com 5 MAIN COMPONENTS TOOLS MANPOWER C Monitor Arm Accesories 3 E B A C D A B C D E A Handset B Media Hub D Front Gutter E Multi Drawer Manpower x1 Power Tool x1 Allen Key x5 ...

Page 6: ...ow the table top using a screw The installation for A Handset is completed Attach B Media Hub on the table top Tighten the screw on top of B Media Hub The installation for Media Hub is completed 1 2 3 4 A A B B screw screw ...

Page 7: ... at the bottom The installation for C Monitor Arm is completed Attach D Front Gutter below the table top using screw Attach the top part of E Muli Drawer below the table top using screw Slot in the bottom part of the E Multi Drawer and the installation is completed 2 4 5 6 3 1 The installation for D Front Gutter is completed ...

Page 8: ...antoffice com 8 MAIN COMPONENTS TOOLS MANPOWER Control Box 4 Manpower x1 Power Tool x1 Allen Key x5 A B A B Please refer handset manual instruction that is provided A Control Box B Power Plug Self Tap Screw ...

Page 9: ...1 Attach C control box below the table top using self tap screw STEP 2 Plug in the main plug to the power extension inside the trunk towards the power extension inside the front gutter E Wall Socket D Power Extension C Control Box B Actuator A Handset ...

Page 10: ...ble line from the E wall socket go through the umbilical cord towards the C power extension inside the front gutter Cable line from the C power extension inside the front gutter to the D control box 4 5 6 1 2 3 4 5 6 STEP 3 Attach the cable point to the rest of the accesories STEP 4 Reset procedure to follow before use Hold up and down button until desk is in lowest position and then slightly goes...

Page 11: ...E 2 2 Metal 861 36 RECYCLABLE 3 5 7 6 1 Metal 1211 84 RECYCLABLE 4 detach the adjustable feet detach rubber All components are easy to dismantle and recycle Undo the step of all installation for recycleable or reuse purposes 3 XXX 50 WEEE WASTE ELECRICAL ELECTRONIC EQUIPMENT XXX 10 RECYCLABLE XXX 10 RECYCLABLE XXX 10 RECYCLABLE 8 2 2 ...