background image

8

Mareli Systems

3.3 Assembly of the duct components.

  

Duct components and pipes

For the assembly of the duct pipes the use of non-flammable materials, resistant to the flammable 

products and condensation is obligatory. The assembly must be performed in such a manner so 

it guarantees the airtight sealing and prevents condensation. If possible, avoid adding horizontal 

sections. Direction shift is done by using knee joints with a max angle of 45˚.

For heating devices equipped with a smoke ventilator, i.e all of the “MARELI” stoves, the follow-

ing instructions must be observed:

Chimney

The chimney or the duct component must conform with the 

following requirements: to be airtight, waterproof and prop-

erly insulated, to be constructed with materials resistant to 

the normal mechanical wear and to the heat coming from the 

combustion products and condensation. 
• 

To be kept away from flammable materials. 

The recommended chimney draft at work - from 12-20 Pa.

• 

Horizontal sections must have a minimum incline 

of 3° upwards;

• 

The length of the horizontal sections must be as 

short as possible, but without exceeding 3 m; 

• 

More than four direction shifts are forbidden, 

including the cases where a T-shaped element is 

used;

• 

The duct components must be airtight and to be 

insulated if extending outside the premises in 

which the fireplace is installed;

• 

The duct components must allow a soot cleaning;

• 

The duct components must have a constant sec-

tion. A section change is allowed only in the 

chimney joint;

CHIMNEY EXITS 

(ANTI-WIND)

45

5 m (MAX)

(MAX)

Attention!!!  In case of a fire hazard turn off the product from the display. This will stop the oxygen 

flow to the product.

Roof incline ≥ 10 °

Height above the roof = 40 cm

90°

Distance measured at 90 ° from

roof area = 1.3 m

Summary of Contents for PRIMAVERA 18

Page 1: ...PRIMAVERA 18 24 Pellet stove Assembly and exploitation manual The present stove is designed and manufactured according to Standards BNS Bulgarian National Standard EN 14785 2006 Mareli Systems...

Page 2: ...aviouroromissions Anyinterventionorreplacementthatismadebyunauthorizedpeopleorusingnonoriginalspare partsfortheproductcanberiskyfortheuserandreleasethecompanyfromallliability Mostsurfacesofthestoveare...

Page 3: ...ss no agglutinate agents glues resins and others are added Actual ly the integrity of the pellets is guaranteed by the lignite a natural ingredient contained in the wood itself While the wood has a ca...

Page 4: ...ion V Hz 60 310 60 310 Electrical supply V Hz 230 50 230 50 Water jacket capacity L 41 41 Working pressure bar 0 5 2 0 0 5 2 0 Space heating output Kw 2 3 Working at environment temperature C 5 40 5 4...

Page 5: ...e back of the wall Minimum distances from the wall to the stove should be at least 400 mm The mini mum space in front of the fireplace should be 1500 mm The minimal distance of the stove from combusti...

Page 6: ...6 Mareli Systems CHECK ITEMS BEFORE INSTALLATION Chimney exit Chimney Connection to chimney Connection to the stove Security distances The floor Inlet air The chimney revision door...

Page 7: ...ped with water serpentine and a solar panel For economy and efficiency of the system and a constant avail ability of cheap hot water a qualified assembly of the automatic shifter controlling the therm...

Page 8: ...echanical wear and to the heat coming from the combustion products and condensation To be kept away from flammable materials The recommended chimney draft at work from 12 20 Pa Horizontal sections mus...

Page 9: ...Systems 3 4Typesofconnectiontothechimney Chimney exit Moisture channel Chimney Thermal insulation External wall Connection to chimney Flue gas connection Heat generator T connection The chimney revis...

Page 10: ...pose make sure the fireplace has ceased operation and is completely cold Pull up the combustion pot and remove it from the stove and then clean it from soot When removed fuel pot at the bottom of the...

Page 11: ...11 Mareli Systems Cleaning the glass Use an non abrasive cloth Clean the flue gas outlet Cleaning the pellet bunker Combustion chamber Clean the ashtray...

Page 12: ...the fireplace may fall hot burning particles as hot ash and small particles burning coal which could lead to a fire in the heated room It is therefore necessary that the product always works with a t...

Page 13: ...ystems K400 TOUCH SCREEN DISPLAY 1 HOMEPAGE Errors Code Date Time HOMEPAGE 1 2 Main Temperature Main Thermostat Functioning State ON OFF Settings Display Info Chrono 11 24 Fri 14 Oct 2016 65 21 C IGNI...

Page 14: ...3 Auger Aux1 Pump 1 Aux1 Pump 2 Aux3 HOMEPAGE 2 2 L6 L7 L8 System activity LEDS The Quick visualization of the system main function is accessed through a vertical swipe to the top side of the screen S...

Page 15: ...Oct 2016 65 21 C IGNITION Er 01 Er10 10 50 11 20 11 20 11 20 11 20 Er 53 Er 53 Er 53 Er 53 Error List By clicking on you can see the errors stored by date time and description Scroll to unlock Error 1...

Page 16: ...ical personnel Settings Menu 12 18 Ven 14 Ott 2016 28 22 C RECUPERO ACCENSIONE Er52 COMBUSTION HEATING REMOTE PANEL MANUAL LOADING RESET SERVICE Setting Menu 11 24 Ven 14 Ott 2016 65 C IGNITION Er 01...

Page 17: ...05 15 30 00 45 15 02 03 05 04 06 00 15 45 30 00 To edit the time slots press on the corresponding Frame Time Scroll Up or Down to change the System on off Time 5 INTERNAL MENU STRUCTURE Potenza Pelle...

Page 18: ...ontrol panel is 17 and subsequently the others according to the number provided by the system Control panel restart this function allows the control panel to be restarted Sound this function allows th...

Page 19: ...52 Error Module I O I2C Er57 Test Forced Draught High in Check Up fail Service Service error It notifies that the planned hours of functioning is reached It is necessary to call for service ALARMS Des...

Page 20: ...IN 7 RS232 47 46 49 48 51 50 52 54 53 47 46 49 48 51 50 52 54 53 AUX 3 COM N O GND S9 GND S10 S11 Vc V IN 9 IN 10 11 POWER CABLE COMBUSTION FAN PUMP 1 IGNITER AUGER THREE WAY VALVE OR PUMP 2 DISPLAY E...

Page 21: ...21 Mareli Systems FIRST CONFIGURATION First select the plumbing installation parameter P26 from the Enable menu of the Technical menu...

Page 22: ...22 Mareli Systems...

Page 23: ......

Page 24: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Reviews: