background image

10

Mareli Systems

Example scheme for installation of an anti-condensation valve. It is recommended 

that the valve be at least 50 C. At the discretion of the installer, a valve with a higher 

return water temperature may be installed.

3.3 Assembly of the duct components.

  

Duct components and pipes

For the assembly of the duct pipes the use of non-flammable materials, resistant to the flammable 

products and condensation is obligatory. The assembly must be performed in such a manner so 

it guarantees the airtight sealing and prevents condensation. If possible, avoid adding horizontal 

sections. Direction shift is done by using knee joints with a max angle of 45˚.

For heating devices equipped with a smoke ventilator, i.e all of the “MARELI” boilers, the follow-

ing instructions must be observed:

• 

Horizontal sections must have a minimum incline 

of 3° upwards;

• 

The length of the horizontal sections must be as 

short as possible, but without exceeding 3 m; 

• 

More than four direction shifts are forbidden, 

including the cases where a T-shaped element is 

used;

• 

The duct components must be airtight and to be 

insulated if extending outside the premises in 

which the fireplace is installed;

• 

The duct components must allow a soot cleaning;

• 

The duct components must have a constant sec-

tion. A section change is allowed only in the 

chimney joint;

CHIMNEY EXITS (ANTI-WIND)

Summary of Contents for ECOSTAR AUTO 50

Page 1: ...Mareli Systems ECOSTAR AUTO 50 KW Pellet BOILER Assembly and exploitation manual...

Page 2: ...ouroromissions Anyinterventionorreplacementthatismadebyunauthorizedpeopleorusingnonoriginalspare partsfortheproductcanberiskyfortheuserandreleasethecompanyfromallliability Mostsurfacesoftheboilerareex...

Page 3: ...ocess no agglutinate agents glues resins and others are added Actual ly the integrity of the pellets is guaranteed by the lignite a natural ingredient contained in the wood itself While the wood has a...

Page 4: ...4 Mareli Systems 1615 808 861 808 861 448...

Page 5: ...5 Mareli Systems 1 0 0 0 0 220 318 G 1 1 4 G 1 1 4 G 1 1 4 167 1053 448 168 298...

Page 6: ...ing mechanism for the turbulators OPTIONAL m m m m 6 8 m 6 86 m m m m m 8 6 m m m m Display Manual cleaning mechanism for the turbulators Combustion Chamber Igniter Automatic cleaning Mechanism for th...

Page 7: ...e wall Minimum distances from the wall to the boiler should be at least 400 mm The mini mum space in front of the fireplace should be 1500 mm The minimal distance of the boiler from combustion materia...

Page 8: ...8 Mareli Systems CHECK ITEMS BEFORE INSTALLATION Chimney exit Chimney Connection to chimney Connection to the boiler Security distances The floor Inlet air The chimney revision door...

Page 9: ...pped with water serpentine and a solar panel For economy and efficiency of the system and a constant availability of cheap hot water a qualified assembly of the automatic shifter controlling the ther...

Page 10: ...ontal sections Direction shift is done by using knee joints with a max angle of 45 For heating devices equipped with a smoke ventilator i e all of the MARELI boilers the follow ing instructions must b...

Page 11: ...mal mechanical wear and to the heat coming from the combustion products and condensation To be kept away from flammable materials The recommended chimney draft at work from 12 20 Pa 45 5 m MAX MAX Att...

Page 12: ...Systems 3 4Typesofconnectiontothechimney Chimney exit Moisture channel Chimney Thermal insulation External wall Connection to chimney Flue gas connection T connection The chimney revision door Heat g...

Page 13: ...hould be done only when cold The cleaning of the combustion chamber must be carried out daily For this purpose make sure the fireplace has ceased operation and is completely cold Pull up the combustio...

Page 14: ...14 Mareli Systems CLEANING THE PELLET TANK ECOSTAR AUTO...

Page 15: ...15 Mareli Systems Left inspection door Right inspection door ECOSTAR AUTO ECOSTAR AUTO...

Page 16: ...16 Mareli Systems 230V 50HZ PUMP 2 PUMP COLD WATER HOT WATER OUTLET SAFETY VALVE EXHAUST FAN...

Page 17: ...17 Mareli Systems IT IS MANDATORY THAT AT EACH EMPTYING OF THE ASH CONTAIN ERS THE COMBUSTION BOX IS ALSO CLEANED 1 ECOSTAR AUTO...

Page 18: ...18 Mareli Systems EMPTY THE FIRST ASH CONTAINER 2 ECOSTAR AUTO...

Page 19: ...19 Mareli Systems REMOVE THE 2 OTHER ASH CONTAINERS FROM THE SIDES 3 ECOSTAR AUTO...

Page 20: ...20 Mareli Systems EMPTY THE 2 SIDE ASH CONTAINERS ECOSTAR AUTO...

Page 21: ...f the fireplace may fall hot burning particles as hot ash and small particles burning coal which could lead to a fire in the heated room It is therefore necessary that the product always works with a...

Page 22: ...ystems K400 TOUCH SCREEN DISPLAY 1 HOMEPAGE Errors Code Date Time HOMEPAGE 1 2 Main Temperature Main Thermostat Functioning State ON OFF Settings Display Info Chrono 11 24 Fri 14 Oct 2016 65 21 C IGNI...

Page 23: ...3 Auger Aux1 Pump 1 Aux1 Pump 2 Aux3 HOMEPAGE 2 2 L6 L7 L8 System activity LEDS The Quick visualization of the system main function is accessed through a vertical swipe to the top side of the screen S...

Page 24: ...Oct 2016 65 21 C IGNITION Er 01 Er10 10 50 11 20 11 20 11 20 11 20 Er 53 Er 53 Er 53 Er 53 Error List By clicking on you can see the errors stored by date time and description Scroll to unlock Error 1...

Page 25: ...nu 12 18 Ven 14 Ott 2016 28 22 C RECUPERO ACCENSIONE Er52 12 18 Ven 14 Ott 2016 28 22 C RECUPERO ACCENSIONE Er52 COMBUSTION HEATING REMOTE PANEL MANUAL LOADING RESET SERVICE Setting Menu 11 24 Ven 14...

Page 26: ...3 15 04 30 09 00 11 30 21 15 23 30 Start Stop 01 02 04 03 05 15 30 00 45 15 02 03 05 04 06 00 15 45 30 00 To edit the time slots press on the corresponding Frame Time Scroll Up or Down to change the S...

Page 27: ...ontrol panel is 17 and subsequently the others according to the number provided by the system Control panel restart this function allows the control panel to be restarted Sound this function allows th...

Page 28: ...V IN 7 RS232 47 46 49 48 51 50 52 54 53 47 46 49 48 51 50 52 54 53 AUX 3 COM N O GND S9 GND S10 S11 Vc V IN 9 IN 10 11 POWER CABLE PROTECTION AGAINST OVERHEATING OFWATER DISPLAY RELAY FOR THE CLEANIN...

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Reviews: