background image

Combined Boiler MARELI “CB 35”

Assembly and exploitation manual

Mareli Systems

Summary of Contents for CB 35

Page 1: ...Combined Boiler MARELI CB 35 Assembly and exploitation manual Mareli Systems...

Page 2: ...f this series are designed to uti lize solid fuel wood coals It has a welded steel con struction The resulting heat is absorbed by the heat ex change surface of the boiler body and transmitted the hea...

Page 3: ...is to be mounted The funnel with an outer diameter of F145 is situated in the upper rear part of the boiler and leads off the smoke gasses through the chimney The steel heat exchanger is isolated wit...

Page 4: ...onnecting the safety heat exchanger Filling the heating installation and density check 4 Instructions for connecting the air supply and exhaust gases Making the connection with the chimney Keep in min...

Page 5: ...joints to the water tank of which can not be closed are mounted Close the connection between the enlarging pot and the system by closing the valve Open the mixing and the stopping valves from the wate...

Page 6: ...low and this results in better gas efficiency For this purpose pull the valve lever at the rear side of the heating boiler to a vertical po sition after 10 15 minutes Info An excessive air supply may...

Page 7: ...may freeze due to low temperatures If possible leave the heating installation constantly running Protect the heating installation from freezing by eventually draining the heating installation on the...

Page 8: ...ressure of at least 1 bar Check the working pressure of the heating installation If the manometer pointer is under the red point er then the working pressure is too low Water must be added Instruction...

Page 9: ...tat open flame return from the brazier Er07 Encoder Error The error may occur due to lack signal from Encoder Er08 Encoder Error The error can occur due to problems of adjustment of the number of revo...

Page 10: ...ond case the user selects the desired power On the left side of the display are signalled the combustion modality A automatic combustion M manual combustion and the working power of the system Recipe...

Page 11: ...day at the desired time Ex 6 30 The system turns on at 20 30 on Tuesday and turns off at 6 30 on Wednesday Weekly The programs are the same for all days of the week Week end Choose between Monday Fri...

Page 12: ...12 Mareli Systems WIRING DIAGRAM SMB 50...

Page 13: ...13 Mareli Systems WIRING DIAGRAM PB 40 52...

Page 14: ...14 Mareli Systems...

Page 15: ...15 Mareli Systems...

Page 16: ...hey are due to printing or transcription errors We reserve the right to make any change that appears to be necessary or useful without harm the essential characteristics Mareli Systems MareliSystems I...

Reviews: