4
FIRST SETUP:
Unpack the GT424 carefully from steel side panels.
If the drive side needs to be changed to the other side, do NOT remove the main
spike shaft. You can easily exchange the side weights with the complete gearbox,
because the main spike shaft has a tap for the belt pulley at each side.
Carefully take the belt drive apart and built it exactly the same way at the other
side of the head. Same thing for the side weights incl. the bolts/ nuts.
Normally the GT424 is delivered with the right greensmower mounting kit.
We have the following kits available:
TORO Triflex 3150/3250 Jac. Gplex/ Gking JohnDeere
2500B/E
Summary of Contents for GT 424-03 VibeSpike- SeederC
Page 8: ...8 ...