background image

 

 

 

Summary of Contents for GT 414- 072

Page 1: ...re determine the available capacity Everybody should check the greensmower during work if it isn t overloaded by checking the heat built up and take the correct measurements MAREDO DOES NOT TAKE ANY L...

Page 2: ...oes with steel enforced toe caps long trousers gloves tie up long hair and use protection glasses for the eyes 7 Never overload the Maredo 8 Check the MAREDO minimal once a week to ensure there are no...

Page 3: ...king width 520 mm 21 per head Working depth 7 15 mm 0 28 0 60 Hole spacing 20 x 45 mm 0 80 x 1 77 Driving speed 0 5 4 8 km h 0 3 3 mph Dosing rate 6425555 Fescue 0 6 14 4 gr m 0 6 2 9 lbs 1000 sqft 64...

Page 4: ...ure you mount them in exact the same position as before do not mirror them see picture Just easily change the parts from Right to Left This point should always face towards the front side Next we need...

Page 5: ...te is not only determined by the gear set but also by the gap between the dosing roller and rear seal plate See also the dosing decal in the seed box The larger the gap the more seed is sown Calibrate...

Page 6: ...enly at both sides Side support wheel 2x Front seal strip Rear guide strip Seed goes through this gap which can be adjusted Unscrew all 5 bolts 1 turn use feeler gauge and set at the right distance Ch...

Page 7: ...o change the shaft remove the seed box first by removing 4 bolts see the figure below When the secure washer is removed the dosing shaft can be removed Replace it and take any axial clearance away by...

Page 8: ...8...

Page 9: ...9...

Page 10: ...10...

Page 11: ...11...

Page 12: ...12...

Reviews: