1900062
REV.2
Page 2 of 4
Electrical Installation Procedure:
1000651 / 656 - 2.8kW/230V ac
– plug into a suitable 13A supply is required.
1000650- / 655 - 5.6kW/230V ac - This unit must be connected to a suitable
30A single phase power supply. This should be done by a qualified electrician.
1000650MJ 3.6kW/200Vac
– This unit must be connected to a suitable supply.
This appliance must be earthed!
Plumbing Installation Procedure:
A minimum continuous flow rate of 2 Litres per minute is required for correct
operation. Interruption in water flow rate can result in a lower brew volume.
Connect Filtro Shuttle to suitable water supply using the hose enclosed.
Connection to Filtro Shuttle is from the bottom of the unit.
All plumbing should be done by a qualified service engineer.
Start-up Procedure:
Check that all installation procedures have been carried out.
Switch on the power to the unit, All the LEDs on the control panel will flash
momentarily.
Switch the machine on by pressing the Power Button (See below).
The machine will automatically take in water. The Power On LED will begin to
flash until water has passed safely above the elements (~ 3 minutes).
Heating will begin, and the Power On LED will stop flashing and glow.
When the machine is full and ready to brew the Ready To Brew LED will glow.
5.6kW will take ~15 - 20min, 2.8kW will take ~30 - 40 min. 3.6kW will take ~27-
37min
FILTRO SHUTTLE QUICK OPERATION INSTRUCTIONS