background image

8516 Hybrid NVR with RAID Installation Guide

13

Feature Overview 

Weight

RR models with docking station (no hard drives): 18.5 pounds / 8.4 kilograms

SR models with backplane (no hard drives): 13.0 pounds/5.9 kilograms

Each hard drive: Approximately 6 pounds / 2.8 kilograms

Operating and Storage Temperature

Operating temperature: 41 to 104

°

 Fahrenheit / 5 to 40

°

 Celsius

Storage temperature: -40 to 158

°

 Fahrenheit / -40 to 70

°

 Celsius

WARNING:  

The recorder and docking station (if required) must be mounted in accordance with 

the mounting guidelines in this publication to ensure the unit remains within the 
recommended operating temperature range. For more information, see “Mounting 
the Recorder” on page 27.

Power Ratings

Power input: 100-240 volts AC input (auto-sensing)

Current rating: 2.3 A

Frequency range: 50-60 Hz

Power consumption: 50 W (typical)

Summary of Contents for 8516 RR

Page 1: ...March Networks 8516 Hybrid NVR with RAID Models 8516 SR and 8516 RR Installation Guide...

Page 2: ...1 800 563 5564 Latin America 52 55 5259 9511 Europe 39 0362 17935 Asia 65 6818 0963 Australia and New Zealand 61 1300 089 419 Middle East and Africa 971 04 399 5525 www marchnetworks com Notice of Rig...

Page 3: ...ry Notice 6 Avis pour les batteries 6 Avis sur le bloc de batterie NiCd 6 Avis sur la batterie Lithium 7 Safety Notice 7 Avis de s curit 7 Fuse 8 Fusible 8 Anti Static Precautions 8 Servicing Notice 8...

Page 4: ...Ports 21 Video Output 21 HD Monitor Output 22 Power Connector and Fuse Compartment 23 Power Connector 23 Fuse Compartment 23 Replacing the Fuse 23 Hard Drives 24 Hard Drive Details 24 Hard Drive Array...

Page 5: ...t generates uses and can radiate radio frequency energy and if not installed and used in accordance with the installation guide is liable to cause harmful interference to radio communications Operatio...

Page 6: ...t disassemble the NiCd battery pack Do not open or try to open the individual NiCd battery pack cells Do not dispose of the NiCd battery pack in fire Do not short circuit the NiCd battery pack termina...

Page 7: ...er cord and plug with a properly grounded outlet connected to earth To maintain safety compliance ensure the AC power cord has the appropriate safety approvals for the country in which the equipment i...

Page 8: ...m me type et classe Pour plus d informations consultez Power Connector and Fuse Compartment la page 23 Anti Static Precautions Ensure proper use of an anti static guard during installation to avoid d...

Page 9: ...ploying the recorders For more information see the documentation available from the March Networks Partner Portal The 8516 NVR is available in two distinct types the RR model 8516 RR which comes with...

Page 10: ...st efficient use of drive capacity Hard Drives Each unit must have four hard drives to support RAID Various drive capacities are available but each of the four drives must be the same capacity to supp...

Page 11: ...Note A wall mounting kit can be purchased separately if required WARNING The procedures contained in this guide outline how to install or service components located inside the unit requiring the remo...

Page 12: ...ngs of the unit Dimensions of the RR Model with Docking Station Dimensions of SR Model with Backplane 17 4 inches 44 2 centimeters 19 2 inches 48 8 centimeters 16 0 inches 40 6 centimeters 3 1 inches...

Page 13: ...perature 41 to 104 Fahrenheit 5 to 40 Celsius Storage temperature 40 to 158 Fahrenheit 40 to 70 Celsius WARNING The recorder and docking station if required must be mounted in accordance with the moun...

Page 14: ...e total number of cameras is 16 The 8516 does not support any IP only camera channels For example if no analog cameras are in use the 8516 model supports up to 16 IP video cameras If no IP cameras are...

Page 15: ...alues are across all 16 video inputs 8516 Models NTSC 15 FPS per channel all 16 channels 240 FPS at 4CIF PAL 13 FPS per channel all 16 channels 200 FPS at 4CIF IP Camera Video Inputs The IP camera inp...

Page 16: ...timer has expired and reset the system Operation LED The status of the unit s operation Green Solid The software in the unit is operating correctly and the unit is powered and running Flashing The op...

Page 17: ...e docking station Two Front USB Ports There are two USB ports on the front of the unit for connection of external peripherals Each port provides up to 0 5 A to power peripherals with a USB cable The p...

Page 18: ...ndicates the 12 volt positive connection pin RS 485 Interface The RS 485 interface allows you to control a PTZ camera with the following pins You can also use this to provide text capture with an RS 4...

Page 19: ...e graphic above 3 Attach the device to the appropriate terminals For alarm devices Use the G ground terminal closest to the alarm terminal when connecting the common wire Note The alarm input is open...

Page 20: ...vice whether intercom or speaker includes a built in amplifier Output specification unbalanced 600 1Vp p line level Pinout Description Audio In 1 Signal for audio input channel 1 Connect the return to...

Page 21: ...on the port Green LED off A 10 100 BaseT link is negotiated on the port Two Rear USB Ports Two USB ports provide connections for external peripherals provide up to 0 5 A per port to power peripherals...

Page 22: ...ole User Manual or online Help Local Control You can also access the NVR through a Local Control interface which you view using the monitor attached to the HD output By default local control is disabl...

Page 23: ...e The fuse is located in the fuse compartment at the base of the AC power cord connector To replace the fuse power down the unit remove the AC power cord from the rear of the docking station and then...

Page 24: ...ther a brand new drive or has been pre formatted to clear any other data from it The RAID array will not rebuild if the replacement disk already contains data Do not place a RAID formatted hard drive...

Page 25: ...516 Hybrid NVR with RAID Installation Guide 25 Feature Overview For more information on health alerts see the Administrator Console User Manual available from the March Networks Partner Portal website...

Page 26: ...raceful shut down if power is removed for more than 15 seconds Custom NiCd battery pack supplied by March Networks Lithium Battery Provides backup power for the unit s clock WARNING Before you replace...

Page 27: ...Console application is included on the provided software DVD For more information see the Administrator Console User Manual available for download from the March Networks Partner Portal Mounting the R...

Page 28: ...station or the recorder unit using the brackets provided in the wall mounting kit The wall mounting kit is not included with the recorder it must be purchased separately WARNING The unit must be mount...

Page 29: ...arge countersunk screws provided in the wall mounting kit to attach the brackets to the docking station The following figure shows how the brackets are attached to the docking station Wall mounting At...

Page 30: ...tion before you mount it on the wall To wall mount the docking station 1 Locate the left and right wall stud to which the recorder is to be mounted If the wall studs are behind drywall use a stud find...

Page 31: ...of the two lower mounting holes 6 Remove the docking station from the mounting screws and put it aside 7 Install the lower mounting screws at the marked locations If the lower mounting location is in...

Page 32: ...s provided in the wall mounting kit to attach the brackets to the recorder The following figure shows how the brackets are attached to the recorder Wall mounting Attaching the mounting brackets to the...

Page 33: ...ount the recorder 1 Locate the left and right wall stud to which the recorder is to be mounted If the wall studs are behind drywall use a stud finder to locate the wall studs and then mark the wall st...

Page 34: ...r mounting location is in a wall stud thread the screw directly into the wall stud If the location is in drywall first install a drywall anchor then thread the screw into the anchor Do not thread the...

Page 35: ...clear any other data on it The RAID array will NOT rebuild if the replacement disk already contains data Installation Requirements The following are included in the packaging with the recorder 16 scre...

Page 36: ...The following photo shows the hard drive positions in the unit without any hard drives installed Important This unit must contain all four hard drives to support RAID The following photo shows a close...

Page 37: ...ws attaching the old hard drive to the bracket and remove the old hard drive 7 Insert the new hard drive into the bracket using the four screws For the hard drives at the bottom of each bracket positi...

Page 38: ...use 5 3 in lbs inch pounds of torque 8 For each position where you are replacing a hard drive locate the data and power cables and connect both cables to the hard drive before you install the bracket...

Page 39: ...er cable for the hard drives in position three and four on the far left as shown in the photos below 10 The data cables are connected to the right side of the RAID card which is attached on top of the...

Page 40: ...nd 4 must have the side with the exposed electronics facing down the label facing up Install and tighten the two screws on one side of a hard drive before installing and tightening the two screws on t...

Page 41: ...into the lock 2 Turn the key in one of the following directions Clockwise Turns the unit on If the unit has a docking station when the unit is properly docked the key turns easily in the lock If the k...

Page 42: ...n Standards Committee A video standard typically used in North America NVR Network Video Recorder See also Recorder PAL Phase Alternation Line The analog television display standard used in Europe and...

Page 43: ...ment and hosted services We are proud to work with many of the world s largest financial institutions retail brands cannabis operators and transit authorities and deliver our software and systems thro...

Reviews: