Installation Requirements
1)
Approvals:
Sea-Chest installations must be approved on a case-by-case basis with regard
to the vessel’s national registry and corresponding maritime authority. The ship owner
and shipyard performing the installation are responsible for obtaining installation
approval.
2)
Power supply: For the Processor Units AC Power w
e recommend the use of an
Uninterruptible Power Supply (UPS). The UPS should have the ability to maintain power
for 10 minutes; This allows shut off of the equipment in the case of a AC power failure.
This also prevents shut off due to power surges/loses due to other vessel equipment.
Many Vessels are equipped with AC inverts. These must be Pure Sine Inverters with
sufficient power to support the system. Hoist DC power must be supplied from Vessel
Power sources. 22KHz will also require AC power for the Motor.
3)
Dry Dock
: Ensure proper clearance under Sea-Chest for sonar installation. Avoid placing
supporting blocks in the area of the Sea-Chest. In the Note section of this manual, log the
position of the Sea-Chest for future reference.
4)
Wiring:
All cables must be supported or protected along its entire length. Conduit or
cable trays should be used. Cables must be installed so as not to run in the areas of high-
power supplies, antenna cables or other sources of interference.
5)
Vibration:
Vibration on any of the equipments must be monitored. Excessive vibration
will require dampeners to be installed. Improper installation on Transducer Guides can
result in Flow related vibration.
6)
Temperature and Humidity: All equipment, unless otherwise specified, must be
protected from extremes in temperature and humidity.
7)
Warranty:
The warranty is only valid when the installation is made in accordance with this
manual. Note that the Warranty Registration Card must be returned by the vessel to MAQ
SONAR within 30 days of the installation to be validated (see the example below).
1
Summary of Contents for 22KHz
Page 1: ...MAQ SONAR COMPANY div of Helo Enterprises Inc Technical and Installation Manual ...
Page 6: ...Intentionally left blank for future use iv ...
Page 8: ...Intentionally left blank for future use vi ...
Page 10: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 22: ......
Page 23: ...60 90KHz Sea Chest 22KHz Sea Chest 11 ...
Page 24: ...GM4501 60 90kHz Transducer Pipe with Flange KA22005 22kHz Transducer Pipe with Flange 12 ...
Page 25: ...60 90KHz Sea Chest Guides 13 ...
Page 26: ...14 ...
Page 27: ...15 ...
Page 28: ...22KHz Sea Chest Guides 16 ...
Page 29: ...17 ...
Page 30: ...18 ...
Page 31: ...60 90KHz Hoist 19 ...
Page 32: ...22KHz Hoist 20 ...
Page 33: ...21 ...
Page 34: ...22 ...
Page 35: ...23 ...
Page 36: ...22KHz SHIELD INSTALLATION 24 ...
Page 37: ...25 ...
Page 38: ...26 ...
Page 39: ...27 ...
Page 40: ...PROCESSOR UNIT CASE DIMENSIONS TRANSCEIVER UNIT CASE DIMENSIONS 28 ...
Page 41: ...TRANSMITTER UNIT CASE DIMENSIONS JOYSTICK DIMENSIONS 29 ...
Page 42: ...UPPER HOIST CONTROL DIMENSIONS KEYPAD DIMENSIONS 30 ...
Page 43: ...OMNI INSTALLATION WIRING DIAGRAM 31 ...
Page 45: ...33 ...
Page 46: ...34 ...
Page 47: ...35 ...
Page 50: ......
Page 54: ......
Page 59: ...43 Operate Panel Setup Panel Display Panel Picture Panel Raw Data Panel Time Panel ...
Page 64: ......
Page 74: ...Intentionally left blank for future use 56 ...
Page 76: ......
Page 80: ......
Page 96: ......
Page 104: ......
Page 106: ...Intentionally left blank for future use 80 ...
Page 107: ...81 ...