Operating Manual
PR-101131-0121 Version 180905
10 of 16
The installation is as follows:
Remove the packaging.
Check the coupling for damages before mounting.
Ensure that the product line is empty and all valves are closed before you assemble the coupling
into the line.
To prevent damages during mounting a suitable wrench should be used for the intended nut flats
on the coupling (threaded connection) or the bolts (flanged connection).
Use
always
a
fitting
wrench
to
mount
the
coupling
to
a
hose,
a
pipe
or
a
tank.
Tighten
the
fitting
using
the
wrench
on
the
respective
side
where
the
connection
is
made.
Torque
forces
should
never
be
transferred
via
the
CBCoupling
and
the
breaking
pins.
The start-up may take place only when the CBCouplings has been mounted as instructed and the necessary
function tests and leak tests have been conducted by the approved authorities.
5 O
PERATION
G
ENERAL NOTES
Operators are obliged to provide qualified and trained personnel familiar with the handling of supply pipes,
safety couplings, any fluid being pumped as well as its danger potential. Such staff must also be familiar with
the applicable safety regulations and the regulations of the employer’s liability association.
D
AILY VISUAL INSPECTION
All couplings should be inspected at the start of each day’s operation. Check for leakage and any obvious
physical damage (such as impacts, etc.).
D
ISMANTLING
When the CBCoupling is taken out of service, the risk of liquid or gas spurting out should be taken into
consideration. Special protective measures such as personal protection equipment must therefore be
adopted.