Installation
Section 2
2-20
Part Number 020001552 5/11
Installation Checklist
Check all fittings and conduit attachments for
leaks. Check all insulated connections to make
sure that they are sealed.
Observe the pump operations for leaks.
Check the water bath for full ice bank.
The stabilized water bath operating temperature
must be maintained at 33°F (.6°C) to 35°F
(1.7°C).
Close water bath feeder valve completely.
Summary of Contents for MULTIPLEX 11M
Page 6: ...Table of Contents continued iv Part Number 020001552 5 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ...Operation Section 3 3 4 Part Number 020001552 5 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...Maintenance Section 4 4 4 Part Number 020001552 5 11 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 41: ......